American Power Conversion 10-40kW manual Start UPS from complete power down, UPS start-up

Page 7

Stop/Start UPS and Operating the External Service Bypass

The UPS is now isolated. Maintenance/repair, disconnection or removal can now be carried out.

CAUTION!

Recharge batteries out of service every 3 months to prevent damage.

WARNING!

Internal DC capacitor may contain energy even after the UPS has been switched off. Allow for automatic discharge by waiting at least 5 minutes after switching off UPS and battery breakers before working on the UPS.

2.4Start UPS (from complete power down)

2.4.1 UPS start-up

CAUTION!

Make sure all cable connections are in place prior to first start-up.

NOTICE!

After first system start-up, check that battery temperature is displayable (press and simultaneously on the display – it reads NV (not valid) if incorrectly installed). A battery capacity test is recommended after the electric installation.

NOTICE!

If for any reason the start-up procedure is interrupted, wait for the display to show the step 4 message: “Stop charge DC capacitors : YES” and repeat procedure from there.

CAUTION!

Do not close the MCCBs in the Battery Breaker Box unless the display reads: “Insert fuse or close MCCB” – otherwise the UPS may be damaged. If the display reads “DC capacitor charge error”, do not close MCCB.

Call for assistance.

 

990-4043

 

 

User Guide APC Silcon 10-40kW 400V UPS

7

Image 7
Contents Copyright 2000 APC Denmark ApS 10-40kW 400V UPS User GuideUser Guide APC Silcon 10-40kW 400V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionDisplay Unit Start UPS from stand-by Stop/Start UPS and Operating the External Service BypassNormal operation Load power xx% Stop UPS for stand-bySwitching off the UPS Stop UPS for complete power downBlank UPS start-up Start UPS from complete power downDisplay shows Bypassing the Single System UPS Operating the External Service Bypass Switch single systemsBypass operation Stop/Start UPS and Operating the External Service Bypass Bypass operation Normal operation Load power 0% System OFF Normal operation Load power 0% Bypass operationBypassing the Parallel UPS System All UPSs Press On the keyboard until Stop/Start UPS and Operating the External Service Bypass Press the green on button on all systems Set input switches Q001 to positionPress On the keyboard Isolating one UPS in a Parallel/Redundant System Stop/Start UPS and Operating the External Service Bypass Operation OperationKeyboard Display of Measured Values Using the Remote DisplayBatt. load Batt. tank Economy Mode Parameter Settings Parameter SettingsParameter Settings Programming Keys Switching to Bypass OperationProgramming Example Load power xx% Mode Comments Alarms and EventsAlarms and Events Displaying the Alarm StackAlarms Description Action Possible AlarmsDisplay will show invalid UPS data Parallel Operation Alarms Rectifying Alarm MessagesCorrection of false alarm situations during service Battery Capacity Test Maintenance & TestingMaintenance & Testing Battery Monitoring TestTest Press Battery capacity TestUntil Test Xxx PressWarranty WarrantyAPC Silcon UPS Limited Factory Warranty APC Denmark How to Contact APCHow to Contact APC APC Corporate