American Power Conversion 10-40kW manual Maintenance & Testing, Fan, Battery Monitoring Test

Page 28

Maintenance & Testing

6.0 Maintenance & Testing

UPS maintenance should be carried out by trained service engineers only. Service and maintenance contract is recommended.

6.1Fan

It is recommended to replace fans every 3 years.

6.2Battery Monitoring Test

Systems with built-in batteries have a standard battery monitoring feature (optional in other systems).

Battery Test Results:

1.Battery OK. Back-up time normal.

2.Reduced battery capacity - “Battery weak” message appears.

3.Battery capacity too low - “Battery defective” message appears.

Carry out battery monitoring test by discharging max. 25% of battery energy. For systems with no battery monitor/no excess back-up time, a battery capacity test is recommended every 6 months.

Carry out battery tests when load is least affected.

6.3Battery Capacity Test

CAUTION!

Allow 16 hours to restore full back-up time after battery capacity tests.

990-4043

28

User Guide APC Silcon 10-40kW 400V UPS

Image 28
Contents 10-40kW 400V UPS User Guide Copyright 2000 APC Denmark ApSUser Guide APC Silcon 10-40kW 400V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionDisplay Unit Stop/Start UPS and Operating the External Service Bypass Normal operation Load power xx%Stop UPS for stand-by Start UPS from stand-bySwitching off the UPS Stop UPS for complete power downBlank Start UPS from complete power down UPS start-upDisplay shows Bypassing the Single System UPS Operating the External Service Bypass Switch single systemsBypass operation Stop/Start UPS and Operating the External Service Bypass System OFF Normal operation Load power 0% Bypass operation Bypass operation Normal operation Load power 0%Bypassing the Parallel UPS System All UPSs Press On the keyboard until Stop/Start UPS and Operating the External Service Bypass Press the green on button on all systems Set input switches Q001 to positionPress On the keyboard Isolating one UPS in a Parallel/Redundant System Stop/Start UPS and Operating the External Service Bypass Operation OperationKeyboard Display of Measured Values Using the Remote DisplayBatt. load Batt. tank Economy Mode Parameter Settings Parameter SettingsParameter Settings Programming Keys Switching to Bypass OperationProgramming Example Load power xx% Alarms and Events Alarms and EventsDisplaying the Alarm Stack Mode CommentsPossible Alarms Alarms Description ActionDisplay will show invalid UPS data Parallel Operation Alarms Rectifying Alarm MessagesCorrection of false alarm situations during service Maintenance & Testing Maintenance & TestingBattery Monitoring Test Battery Capacity TestBattery capacity Test UntilTest Xxx Press Test PressWarranty WarrantyAPC Silcon UPS Limited Factory Warranty How to Contact APC How to Contact APCAPC Corporate APC Denmark