2.7Isolating one UPS in a Parallel Configuration for Service/Maintenance

2.7.1 Isolating one UPS in a Parallel/Redundant System

Mains

Load

Service bypass switch

APC Silcon

UPS

APC Silcon

UPS

In a redundant system one UPS may be isolated for service/maintenance without affecting other parallel UPS(s).

Action

1.Check that the remaining UPS(s) will be able to carry the load when one UPS is isolated.

2.Switch off the system to be isolated for maintenence by pushing the green ON and the red OFF button simultaneously.

3.Disconnect output and mains by setting output switches (Q002) to position 0 and input switch (Q001) to position 0. Disconnect battery by opening battery breaker.

2.7.2Switching Back the UPS to Normal Rarallel/Redundant Operation

Action

1.Set the input switch (Q001) and the output switch (Q002) to position 1.

2.Charge capacitors, connect battery, and start up the UPS as described in 2.4.1. Start UPS (from complete power down).

The UPS will automatically switch to normal operation and start load-sharing with the other parallelled UPS(s).

WARNING!

The system will discharge built-in capacitors.

ALWAYS check with a multimeter that the terminals contain no dangerous voltage before touching the system!

 

990-4043

 

 

16

User Guide APC Silcon 10-40kW 400V UPS

Image 16
Contents 10-40kW 400V UPS User Guide Copyright 2000 APC Denmark ApSUser Guide APC Silcon 10-40kW 400V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionDisplay Unit Stop/Start UPS and Operating the External Service Bypass Normal operation Load power xx%Stop UPS for stand-by Start UPS from stand-bySwitching off the UPS Stop UPS for complete power downBlank Start UPS from complete power down UPS start-upDisplay shows Bypassing the Single System UPS Operating the External Service Bypass Switch single systemsBypass operation Stop/Start UPS and Operating the External Service Bypass System OFF Normal operation Load power 0% Bypass operation Bypass operation Normal operation Load power 0%Bypassing the Parallel UPS System All UPSs Press On the keyboard until Stop/Start UPS and Operating the External Service Bypass Press the green on button on all systems Set input switches Q001 to positionPress On the keyboard Isolating one UPS in a Parallel/Redundant System Stop/Start UPS and Operating the External Service Bypass Operation OperationKeyboard Display of Measured Values Using the Remote DisplayBatt. load Batt. tank Economy Mode Parameter Settings Parameter SettingsParameter Settings Programming Keys Switching to Bypass OperationProgramming Example Load power xx% Alarms and Events Alarms and EventsDisplaying the Alarm Stack Mode CommentsPossible Alarms Alarms Description ActionDisplay will show invalid UPS data Parallel Operation Alarms Rectifying Alarm MessagesCorrection of false alarm situations during service Maintenance & Testing Maintenance & TestingBattery Monitoring Test Battery Capacity TestBattery capacity Test UntilTest Xxx Press Test PressWarranty WarrantyAPC Silcon UPS Limited Factory Warranty How to Contact APC How to Contact APCAPC Corporate APC Denmark