Maintenance & Testing

6.0 Maintenance & Testing

UPS maintenance should be carried out by trained service engineers only. Service and maintenance contract is recommended.

6.1Fan

It is recommended to replace fans every 3 years.

6.2Battery Monitoring Test

Systems with built-in batteries have a standard battery monitoring feature (optional in other systems).

Battery Test Results:

1.Battery OK. Back-up time normal.

2.Reduced battery capacity - “Battery weak” message appears.

3.Battery capacity too low - “Battery defective” message appears.

Carry out battery monitoring test by discharging max. 25% of battery energy. For systems with no battery monitor/no excess back-up time, a battery capacity test is recommended every 6 months.

Carry out battery tests when load is least affected.

6.3Battery Capacity Test

CAUTION!

Allow 16 hours to restore full back-up time after battery capacity tests.

990-4036

User Guide APC Silcon 120-160kW 400V UPS

29

Image 29
Contents Copyright 2000 APC Denmark ApS 120-160kW 400V UPS User GuideThank You Safety Symbols used in this manualUser Guide APC Silcon 120-160kW 400V UPS Contents Display Unit IntroductionIntroduction Normal operation Load power xx% Stop/Start UPS and Operating the External Service BypassStop UPS for stand-by Start UPS from stand-bySwitching off the UPS Stop UPS for complete power downBlank UPS start-up Start UPS from complete power downDisplay shows System OFF Normal operation load power XX%Bypass operation Operating the External Service Bypass Switch single systemsBypassing the Single System UPS Stop/Start UPS and Operating the External Service Bypass Bypass operation Normal operation Load power 0% System OFF Normal operation Load power 0% Bypass operationBypassing the Parallel UPS System All UPSs Acoustic alarm sounds for 30 secs Stop/Start UPS and Operating the External Service Bypass Press On the keyboard Set input switches Q001 to positionPress the green on button on all systems Isolating one UPS in a Parallel/Redundant System Stop/Start UPS and Operating the External Service Bypass Keyboard OperationOperation Batt. load Batt. tank Using the Remote DisplayDisplay of Measured Values Economy Mode Parameter Settings Parameter SettingsParameter Settings Programming Example Switching to Bypass OperationProgramming Keys Load power xx% Alarms and Events Alarms and EventsDisplaying the Alarm Stack Mode CommentsAlarms Description Action Possible AlarmsDisplay will show invalid UPS data Correction of false alarm situations during service Rectifying Alarm MessagesParallel Operation Alarms Maintenance & Testing Maintenance & TestingBattery Monitoring Test Battery Capacity TestUntil Battery capacity TestTest Xxx Press Test PressAPC Silcon UPS Limited Factory Warranty WarrantyWarranty How to Contact APC How to Contact APCAPC Corporate APC Denmark