Installation
Overview
Warning: Review “Safety” on page 1 before starting this installation. Pay strict attention to all safety warnings and caution notices!
•ALL INTERNAL cable connections were made prior to shipment.
•EXTERNAL cable connections with the UPS need to be made
•Control wire connections between the UPS and the MBP additionally need to be made
•Panel board breakers must be ordered separately.
Tools
The following tools are required for this installation:
• | • | M10 nut driver | |
• | Tape measure | • | Standard (flathead) |
• | Pliers | • | Phillips screwdriver |
• | Level | • | T30 Torx screwdriver |
• | Marker | • | 4mm Allen wrench |
• | Drill | • 1/2” socket with ratchet |
Panel board breakers
The
Breaker Type | APC Part# | Breaker Type | APC Part# |
PD1P20ABBSD | PD3P20ABBSD | ||
|
|
|
|
PD2P20ABBSD | PD3P80ABBSD | ||
|
|
|
|
PD2P30ABBSD | PD3P100ABBSD | ||
|
|
|
|
7 |