Automation and Drives - SCE
5.TESTING THE STEP 7 PROGRAM
The STEP 7 program to be tested can now be loaded into the PLC.
In our case, this is only OB1.
18.Save the organization block with and load it into the PLC by clicking on . When this is being done, the key switch on the CPU should be in the STOP position! ( → → )
|
|
|
|
|
|
|
Foreword | Notes | Hardware configuration | STEP 7 program | Testing |
|
|
|
|
|
|
|
|
|
T I A Training Document |
| Page 24 of 25 |
|
| Module | |
|
|
|
|
| A5 | |
Issue date: 02/2008 |
|
| Programming the CPU |