Siemens programming the cpu 314c-2dp manual Hardware and software needed

Page 5

Automation and Drives - SCE

Hardware and software needed

1PC, operating system Windows 2000 Professional starting with SP4 /XP Professional starting with SP1/Server 2003 with 600 MHz and 512 RAM, free hard disk memory approx. 650 to 900 MB, MS Internet Explorer 6.0

2Software: STEP7 V 5.4

3MPI interface for the PC (e.g. PC adapter for USB)

4SIMATIC S7-300 PLC with the CPU 314C-2DP Configuration example:

-Power supply unit: PS 307 2A

-CPU: CPU 314-2DP

1 PC

2 STEP7

3 PC Adapter USB

4 S7-300 with

CPU 314C-2DP

 

 

 

 

 

 

 

 

 

Foreword

 

Notes

Hardware configuration

STEP 7 program

Testing

 

 

 

 

 

 

 

 

 

T I A Training Document

 

Page 5 of 25

 

Module

 

 

 

 

 

 

A5

Issue date: 02/2008

 

 

Programming the CPU 314C-2DP

Image 5
Contents Module A5 Automation and Drives SCE Foreword SeiteTo 3 days Module C To 3 days Module D ForewordFrequency Converter at Simatic S7 Learning ObjectiveHardware and software needed Automation and Drives SCE Operator control and display elements Operating the Cpus 31XCMode selector Status and fault/error displaysPositions of the mode selector Slot for the Simatic Micro Memory Card MMCIntroduction Memory Areas of the CPU 31XCLoad memory RAMRetention of the memory objects Work memory RAMCPU Creating the Hardware Configuration for the CPU 314C-2DPAutomation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Automation and Drives SCE Bit Writing a ProgramAssignment list Automation and Drives SCE Automation and Drives SCE Testing the Program Automation and Drives SCE