NETGEAR XS712T manual Installation

Page 16

4. Installation

4

 

 

 

 

This chapter describes the installation procedures for your XS712T Smart Switch. Switch installation involves the steps described in the following sections:

Step 1: Prepare the Site

Step 2: Install the Switch

Step 3: Check the Installation

Step 4: Connect Devices to the Switch

Step 5: Install an SFP Transceiver Module

Step 6: Apply AC Power

Step 7: Manage the Switch Using a Web Browser or the Smart Control Center Utility

16

Image 16
Contents XS712T Smart Switch Trademarks SupportRevision History Contents Appendix C Notification of Compliance Introduction Features OverviewPackage Contents XS712T Smart Switch Physical Description Front Panel and Back Panel Configuration LED DesignationsPort LEDs Device Hardware InterfacesSystem LEDs Reset Button Factory Defaults ButtonRJ-45 Ports SFP+ PortsApplications Desktop Switching Backbone SwitchingBackbone switching Installation Install the Switch Install the Switch on a Flat Surface To install the switch on a flat surface Prepare the SiteCheck the Installation Connect Devices to the SwitchInstall the Switch in a Rack  To install the switch in a rack To connect devices to the switch Install an SFP Transceiver Module To install an SFP transceiver Apply AC Power  To apply AC powerXS712T Smart Switch Troubleshooting Troubleshooting Chart Additional Troubleshooting SuggestionsConfiguration Network Adapter CardsSwitch Integrity AutonegotiationTechnical Specifications Network Protocol and Standards Compatibility ManagementPerformance Specifications Power SupplyPhysical Specifications Environmental SpecificationsSafety Netgear Wired Products Regulatory Compliance InformationEurope EU Declaration of Conformity FCC Requirements for Operation in the United StatesXS712T Smart Switch FCC Guidelines for Human Exposure