Happy Voyager
Installing the Hoop Tech Device/Machine Set Up | 23 |
|
|
Installing the Clamping system onto the machine. |
|
Warning !! Never power up machine with | WARNING |
ITCS unit installed. Always remove prior to |
|
turning the machine on. |
|
Failure to do so may result in physical inter- |
|
ference between the ITCS and the machine!! |
|
To install, turn on machine, select set to initialize the |
|
|
|
|
|
1 |
|
|
|
| |
machine. (ESC if tutorial menu is displayed.) |
|
|
|
| |
|
|
|
|
| |
Move the pentagram, using the FF and arrow func- |
|
|
|
|
|
tion all the way to the rear most position. |
|
|
|
|
|
Slide the clamping system in from behind (1) and |
|
|
| ||
|
|
|
| 2 | |
then clamp into frame holders. (2) (See picture) |
|
|
|
|
|
|
|
|
|
|
Make sure the locking pins of the arm snap cleanly into the holes of the clamp bracket.
Adjust the Tubular Clamping System height using the two nuts on both the right and left side of the clamp- ing system so that the clamping system:
•Is horizontal
•Does not touch the machine cylinder arm
•Does not exceed the height of 1/16 inches above cylinder arm.
Does not exceed 1/16”