8e6 Technologies TAR quick start Optional Install the Open Racks

Page 22

Optional: Install the Open Racks

After you have installed the inner rails on the chassis, you are ready to install the outer rails of rail assemblies to the rack.

NOTE: The rails are designed to fit in the racks with the depth of 28” to 33”.

Determine the placement of each component in the rack before you install the rails.

Install the heaviest server components on the bottom of the rack first, and then work up.

1.In the package, locate a pair of front (short) and rear (long) brackets. Please note that the brackets are marked with Up/Front Arrows (front) and Up/Rear arrows (rear).

2.Secure the front (short) bracket (marked with the Up/Front arrows) to the outer rail with two Type G screws as shown below.

18

8e6 Threat Analysis Reporter Quick Start Guide

Image 22
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerInstall the Outer Rails Rack Setup SuggestionsInstall the Inner Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Optional Install the Chassis Rails Rack Mount Instructions for MSA Servers8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Quick Start Setup Requirements Initial Setup ProceduresLCD Panel Setup Requirements for SL and HL Units Serial Console Setup Quick Start Setup ProceduresMonitor and Keyboard Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Quick Start menu instructions#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Quick Start Setup confirmation screen Administration menuSystem Status screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementLCD Menu LCD Panel Setup Procedures8e6 menu Current Patch Level IP / LAN1 and LAN2DNS 1 GatewayHost Name Admin Console Wizard User Regional Setting Time Zone, date, timeReboot Heartbeat LCD Options menuShutdown BacklightLCD Controls Wizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Wizard Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Server Settings ConclusionLED Indicator Color Condition Description LED Indicator KeyLED Indicator Key Button Key SL and MSA UnitsHL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDElectromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide