8e6 Technologies TAR quick start Gateway, DNS 1, Host Name

Page 50

Gateway

When the Gateway option is selected, the Gateway screen displays with the Configure Gateway IP menu item.

A.Choose Configure Gateway IP and press the checkmark key to go to the Configure

Gateway IP screen.

B.Use the up / down keys to increase / decrease the current value, and the left / right arrow keys to navigate across the line.

C.Press the checkmark key to accept your entry and to return to the previous screen.

D.Press the “X” key to return to the 8e6 menu.

DNS 1 and 2

When the DNS 1 (2) option is selected, the DNS 1 (2) screen displays with the Configure DNS IP 1 (2) menu item.

A.Choose Configure DNS IP 1 (2) and press the checkmark key to go to the Configure

DNS IP 1 (2) screen.

B.Use the up / down keys to increase / decrease the current value, and the left / right arrow keys to navigate across the line.

C.Press the checkmark key to accept your entry and to return to the previous screen.

D.Press the “X” key to return to the 8e6 menu.

Host Name

When the Host Name option is selected, the Host Name screen displays with the Config- ure Hostname menu item.

A.Choose Configure Hostname and press the checkmark key to go to the Configure

Hostname screen.

B.Use the arrow keys to navigate the menu. Press the right arrow key to view the alphabets in first uppercase and then lowercase, numbers from 0-9, and lastly the symbol characters.

NOTE: Navigation tips:

If the down arrow key is pressed first—instead of the right arrow key—the symbol characters display first.

Press the “X” key to remove a character and move the cursor to the first posi- tion in the line.

46

8e6 Threat Analysis Reporter Quick Start Guide

Image 50
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerInstall the Outer Rails Rack Setup SuggestionsInstall the Inner Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Optional Install the Chassis Rails Rack Mount Instructions for MSA Servers8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements for SL and HL Units Initial Setup ProceduresQuick Start Setup Requirements Serial Console Setup Quick Start Setup ProceduresMonitor and Keyboard Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Quick Start menu instructions#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Quick Start Setup confirmation screen Administration menuSystem Status screen Log Off, Disconnect the Peripherals Physically Connect the Unit to the Network Bandwidth Management8e6 menu LCD Panel Setup ProceduresLCD Menu Current Patch Level IP / LAN1 and LAN2Host Name GatewayDNS 1 Reboot Regional Setting Time Zone, date, timeAdmin Console Wizard User Heartbeat LCD Options menuShutdown BacklightLCD Controls Wizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Wizard Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Server Settings ConclusionLED Indicator Color Condition Description LED Indicator KeyLED Indicator Key Button Key SL and MSA UnitsHL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDElectromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Ethernet Tap Unit from the Box Preliminary Setup ProceduresOther Required Installation Items Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide