8e6 Technologies TAR quick start Install the Chassis into the Rack

Page 25

Install the Chassis into the Rack

CAUTION: Before installing the chassis into the rack:

Make sure that the rack is securely anchored onto an unmovable surface or structure before installing the chassis into the rack.

Unplug power cord(s) of the rack before installing the chassis into the rack.

Make sure that the system is adequately supported. Make sure that all the components are securely fastened to the chassis to prevent components fall- ing off from the chassis.

The rack assembly should be properly grounded to avoid electric shock.

The rack assembly must provide sufficient airflow to the chassis for proper cooling.

Please make sure that all components and all chassis covers are properly in- stalled in the chassis before you install the chassis into the racks; otherwise, out-of-warranty damage may occur.

Slide the chassis into the rack and secure it with two screws on each side of the rack as shown in the picture.

8e6 Threat Analysis Reporter Quick Start Guide

21

Image 25
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction Conventions Used in this Document About this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsInstall the Inner Rails Rack Setup SuggestionsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Rack Mount Instructions for MSA Servers Optional Install the Chassis Rails8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Quick Start Setup Requirements Initial Setup ProceduresLCD Panel Setup Requirements for SL and HL Units Monitor and Keyboard Setup Quick Start Setup ProceduresSerial Console Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Quick Start menu instructions Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure Domain Name Servers screen Configure default gateway screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Administration menu Quick Start Setup confirmation screenLog Off, Disconnect the Peripherals System Status screenBandwidth Management Physically Connect the Unit to the NetworkLCD Menu LCD Panel Setup Procedures8e6 menu IP / LAN1 and LAN2 Current Patch LevelDNS 1 GatewayHost Name Admin Console Wizard User Regional Setting Time Zone, date, timeReboot Shutdown LCD Options menuHeartbeat BacklightLCD Controls Access the Threat Analysis Reporter Administrator Console Wizard Setup ProceduresLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide R3000 Wizard Register R3000 & ER8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Conclusion Server SettingsLED Indicator Key Button Key LED Indicator KeyLED Indicator Color Condition Description SL and MSA UnitsHL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsDeclaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide