8e6 Technologies TAR quick start Current Patch Level, IP / LAN1 and LAN2

Page 49

Reboot >

Shutdown >

NOTE: Navigation tips in the 8e6 menu:

Use the up / down arrow key to scroll up / down the menu

Press the checkmark key to choose the current selection

Press the “X” to go back to the previous screen

Make a selection from the menu, and press the checkmark key to go to that screen.

Current Patch Level

When the Current Patch Level option is selected, “Threat Analysis Reporter” and the ver- sion number of the currently installed build displays.

IP / LAN1 and LAN2

When the IP / LAN 1 (LAN 2) option is selected, the IP / LAN 1 (LAN 2) screen displays with the following menu items:

Configure LAN 1 (2) IP

Change LAN1 (2) Netmask

A.Choose Configure LAN 1 (2) IP and press the checkmark key to go to the Configure

LAN 1 (2) IP screen.

B.Use the up / down keys to increase / decrease the current value, and the left / right arrow keys to navigate across the line.

C.Press the checkmark key to accept your entry and to return to the previous screen.

D.Choose Change LAN1 (2) Netmask and press the checkmark key to go to the Change LAN1 (2) Netmask screen.

E.Use the up / down keys to increase / decrease the current value, and the left / right arrow keys to navigate across the line.

F.Press the checkmark key to accept your entry and to return to the previous screen.

G.Press the “X” key to return to the 8e6 menu.

8e6 Threat Analysis Reporter Quick Start Guide

45

Image 49
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction Conventions Used in this Document About this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsInstall the Inner Rails Rack Setup SuggestionsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Install the Outer Slides Install the Inner SlidesRack Mount Instructions for SL Servers Install the Slide Assemblies to the Rack Install the Chassis into the Rack Rack Mount Instructions for MSA Servers Optional Install the Chassis Rails8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Front of bezel Install the SL or HL Server BezelPower Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Quick Start Setup Requirements Initial Setup ProceduresLCD Panel Setup Requirements for SL and HL Units Monitor and Keyboard Setup Quick Start Setup ProceduresSerial Console Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Quick Start menu instructions Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure Domain Name Servers screen Configure default gateway screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Administration menu Quick Start Setup confirmation screenLog Off, Disconnect the Peripherals System Status screenBandwidth Management Physically Connect the Unit to the NetworkLCD Menu LCD Panel Setup Procedures8e6 menu IP / LAN1 and LAN2 Current Patch LevelDNS 1 GatewayHost Name Admin Console Wizard User Regional Setting Time Zone, date, timeReboot Shutdown LCD Options menuHeartbeat BacklightLCD Controls Access the Threat Analysis Reporter Administrator Console Wizard Setup ProceduresLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide R3000 Wizard Register R3000 & ER8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Conclusion Server SettingsLED Indicator Key Button Key LED Indicator KeyLED Indicator Color Condition Description SL and MSA UnitsHL Unit Rear LED Indicators for Hardware Status Monitoring RAID HL and SL UnitsDeclaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Other Required Installation Items Preliminary Setup ProceduresUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide