8e6 Technologies TAR quick start Optional Install the Traditional UP Racks

Page 20

Optional: Install the Traditional UP Racks

After you have installed the inner rails on the chassis, you are ready to install the outer rails of rail assemblies to the rack.

NOTE: The rails are designed to fit in the racks with the depth of 28” to 33”.

Determine the placement of each component in the rack before you install the rails.

Install the heaviest server components on the bottom of the rack first, and then work up.

1.In the package, locate a pair of front (short) and rear (long) brackets. Please note that the brackets are marked with Up/Front Arrows (front) and Up/Rear arrows (rear).

2.Secure the front (short) bracket (marked with the Up/Front arrows) to the outer rail with two Type G screws. (See the previous page for a description of the Type G screw.)

3.Attach the rear (long) bracket to the other end of the outer rail and secure the rear (long) bracket to the outer rail with a Type G screw as shown below.

4.Measure the depth of your rack and adjust the length of the rails accordingly.

5.Repeat the same steps to install the other outer rail on the chassis.

6.Secure both outer rail assemblies to the rack with Type H screws and Type I wash- ers. (See the previous page for descriptions of Type H and Type I hardware compo- nents.)

16

8e6 Threat Analysis Reporter Quick Start Guide

Image 20
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerRack Setup Suggestions Install the Inner RailsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Optional Install the Chassis Rails Rack Mount Instructions for MSA Servers8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements for SL and HL Units Initial Setup ProceduresQuick Start Setup Requirements Quick Start Setup Procedures Monitor and Keyboard SetupSerial Console Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Quick Start menu instructions#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Quick Start Setup confirmation screen Administration menuSystem Status screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth Management8e6 menu LCD Panel Setup ProceduresLCD Menu Current Patch Level IP / LAN1 and LAN2Host Name GatewayDNS 1 Reboot Regional Setting Time Zone, date, timeAdmin Console Wizard User LCD Options menu ShutdownHeartbeat BacklightLCD Controls Wizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Wizard Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Server Settings ConclusionLED Indicator Key LED Indicator Key Button KeyLED Indicator Color Condition Description SL and MSA UnitsHL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDSafety Compliance Declaration of the Manufacturer or ImporterElectromagnetic Compatibility EMC Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Ethernet Tap Unit from the Box Preliminary Setup ProceduresOther Required Installation Items Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide