8e6 Technologies TAR quick start Declaration of the Manufacturer or Importer, Safety Compliance

Page 68

Regulatory Specifications and Disclaimers

Declaration of the Manufacturer or Importer

Safety Compliance

 

USA:

UL 60950-1 2nd ed. 2007

 

Europe:

Low Voltage Directive (LVD) 2006/95/EC to CB Scheme EN 60950: 2006

 

International:

UL/CB to IEC 60950-1:2006

Electromagnetic Compatibility (EMC)

 

 

 

 

USA:

FCC CFR 47 Part 15, Verified Class A Limit

 

Canada:

IC ICES-003 Class A Limit

 

Europe:

EMC Directive, 2004/108/EC & Low Voltage Directive (LVD) 2006/95/EC

 

Taiwan:

Bureau of Standards and Metrology Inspection (BSMI)

 

 

CNS 13438: 2006

Federal Communications Commission (FCC) Class A Notice (USA)

This equipment has been tested and found to comply with the limits for a Class A digi- tal device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio fre- quency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

FCC Declaration of Conformity

Models: HL-005-004, SL-004-004, MSA-004-004

64

8e6 Threat Analysis Reporter Quick Start Guide

Image 68
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerRack Setup Suggestions Install the Inner RailsInstall the Outer Rails Rack Mount Instructions for HL Servers8e6 Threat Analysis Reporter Quick Start Guide Install the Server into the Rack Install the Server into a Telco Rack Rack Mount Instructions for SL Servers Install the Inner SlidesInstall the Outer Slides Install the Slide Assemblies to the Rack Install the Chassis into the Rack Optional Install the Chassis Rails Rack Mount Instructions for MSA Servers8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Traditional UP Racks 8e6 Threat Analysis Reporter Quick Start Guide Optional Install the Open Racks 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Chassis into the Rack Install the SL or HL Server Bezel Front of bezelCheck the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions LCD Panel Setup Requirements for SL and HL Units Initial Setup ProceduresQuick Start Setup Requirements Quick Start Setup Procedures Monitor and Keyboard SetupSerial Console Setup Link the Workstation to the Threat Analysis ReporterDiagram of SL chassis front panel, power button at far right HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Quick Start menu instructions#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Quick Start Setup confirmation screen Administration menuSystem Status screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth Management8e6 menu LCD Panel Setup ProceduresLCD Menu Current Patch Level IP / LAN1 and LAN2Host Name GatewayDNS 1 Reboot Regional Setting Time Zone, date, timeAdmin Console Wizard User LCD Options menu ShutdownHeartbeat BacklightLCD Controls Wizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Wizard Wizard Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Wizard Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Server Settings ConclusionLED Indicator Key LED Indicator Key Button KeyLED Indicator Color Condition Description SL and MSA Units HL Unit Rear LED Indicators for Hardware Status Monitoring HL and SL Units RAIDSafety Compliance Declaration of the Manufacturer or ImporterElectromagnetic Compatibility EMC Models HL-005-004, SL-004-004, MSA-004-004Electromagnetic Compatibility Class a Notice EC Declaration of Conformity Unpack the Ethernet Tap Unit from the Box Preliminary Setup ProceduresOther Required Installation Items Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Index 8e6 Threat Analysis Reporter Quick Start Guide