Accton Technology CheetaSwitch Workgroup-3726M manual Installing a Management Module

Page 12

Quick Installation Guide

Mounting Switches in a Rack

Please comply with the following instructions to ensure that your switch is securely mounted in the rack.

1.Use a standard EIA 19-inch rack.

2. Use the brackets and screws supplied in the rack mounting kit.

3. Use a cross-head screwdriver to attach the brackets to the side of the switch.

4. Position the switch in the rack by lining up the holes in the attached brackets with the appropriate holes on the rack, and then use the rack-mount screws to mount the switch in the rack.

Installing a Management Module

One Management Module is required to manage all of the switches in the stack. A Management Module only installs in a switch’s rear-panel upper slot, do not try to install it in either of the two lower slots.

You can install a Management Module as described below:

1.Disconnect power to the switch (the modules are not hot-swappable).

2.Remove the face plate on the switch’s upper slot by removing the two screws with a flat-head screwdriver.

3.Before opening the package that contains the module, touch the bag to the switch casing to discharge any potential static electricity.

4.Remove the module from the anti-static shielded bag.

5.Holding the module level, gently push it all the way into the slot along the guide rails, ensuring that it firmly engages with the connector.

6.If you are sure the module is properly mated with the connector, tighten the retainer screws to secure the module in the slot.

Caution: The slide-in modules are not hot-swappable. Be sure you power off the switch before installing any of these modules.

Installing Optional Media and Stacking Modules

The two lower slots on the rear panel of the switch are provided for various optional media expansion modules (100BASE-FX or Gigabit) or Stacking Modules. The 100BASE-FX fiber optic module can be used to connect to remote sites, and a Gigabit module can be used as a network backbone. You can install the media expansion modules in either of the two lower slots, but the Stacking Module must only be installed in the lower-left slot.

4

Image 12
Contents CheetahSwitch Workgroup-3726M Quick Installation Guide Page CheetahSwitch Workgroup-3726M On-line Registration Accton Technology Corporation Limited Warranty Contents Optional Hardware Modules Introduction Installing the Switch Package ContentsDescription of Hardware Mounting the Switch Installing the SwitchInstalling a Management Module Installing Optional Media and Stacking ModulesConnecting to the Stack’s Backplane Connecting the Switch System Making a Connection to an RJ-45 PortConnecting to a 100BASE-FX Port Powering On the Switch Verifying Port Status Verifying System OperationApplications Product Specifications Base UnitSwitching Criteria ModulesTroubleshooting Diagnosing Switch IndicatorsPower and Cooling Problems InstallationPort and Cable Assignments RJ-45 Port DescriptionEMI Certification FCC Class a Certification USACanada Department of Communications Class a Bsmi Class a Taiwan Vcci Class a Compliance JapanCE Mark Declaration of Conformance for EMI and Safety EEC Safety Compliance Warnhinweis Faseroptikanschlüsse Optische SicherheitUnderwriters Laboratories Inc. USA Wichtige Sicherheitshinweise Germany Optional Hardware Modules Page AC-ES3726M E012002-R01 F2.476 150200008100A