3Dress RGB harness over Rotation coil lead wire.
Dress Rotation coil lead wire over DY clip and through rotation coil as shown in picture.
4Dress earth groun wires under DGC and over VD board.
| 19 |
Dress Rotation coil lead wire over DY clip and through rotation coil as shown in picture.
| 19 |