PEAK POWER RATINGS
The amount of power the
Motor Type | Current | Cabinet | Peak Motor | Peak Shaft | Peak Total | |
| (Amps) | Loss (W) | Loss (W) | Power (W) | Power (W) | Rating (VA) |
OS2HBS | 1.70 | 22.0 | 22 | 39 | 83 | 151 |
OS2HBP | 3.39 | 32.0 | 76 | 82 | 190 | 314 |
OS21BS | 1.82 | 24.0 | 30 | 65 | 119 | 205 |
OS21BP | 3.50 | 55.0 | 86 | 129 | 270 | 432 |
OS22BS | 2.38 | 18.0 | 41 | 87 | 146 | 247 |
OS22BP | 3.50 | 29.0 | 93 | 161 | 283 | 451 |
VS12BS | 1.02 | 17.0 | 29 | 32 | 78 | 141 |
VS12BP | 2.04 | 24.0 | 87 | 33 | 144 | 266 |
VS13BS | 1.02 | 18.0 | 25 | 38 | 81 | 147 |
VS13BP | 2.04 | 39.0 | 93 | 32 | 164 | 280 |
VS21BS | 2.27 | 18.0 | 60 | 100 | 178 | 300 |
VS21BP | 3.50 | 37.0 | 105 | 137 | 279 | 438 |
VS22BS | 2.04 | 13.0 | 46 | 93 | 152 | 258 |
VS22BP | 3.50 | 36.0 | 95 | 149 | 280 | 452 |
VS23BS | 2.04 | 14.0 | 39 | 113 | 166 | 281 |
VS23BP | 3.50 | 24.0 | 99 | 202 | 325 | 531 |
VS31BS | 3.05 | 19.0 | 45 | 135 | 199 | 339 |
VS32BS | 3.16 | 22.0 | 57 | 121 | 200 | 334 |
S: Series Configuration P: Parallel Configuration
9 –TEST THE INSTALLATION
System installation should be complete at this point. Perform the test procedure below to verify that your system is functioning properly.
In the test procedure, you will command single revolution moves in the clockwise and counterclockwise direction. If your mechanics do not permit such moves, choose a move that allows you to easily verify correct system response.
TEST PROCEDURE
1.Apply 120VAC power. The green LED labeled PWR should illuminate.
2.Command a slow move of one revolution in the clockwise direction. Verify that the motor turns as commanded.
3.Command a slow move of one revolution in the counterclockwise direction. Verify that the motor turns as commanded.
4.Test the shutdown input. With the motor stopped, activate the input. The motor will have no torque when shutdown is activated. You should be able to turn the motor manually (if your mechanics permit).
Successful completion of this procedure will verify that your controller and motor are correctly connected to the
If the test is unsuccessful, proceed to Chapter 3 Troubleshooting for problem identification and solution procedures.
30 |
| Chapter 2 – Installation |