Daewoo VCR MECHANISM UNIT service manual Deassembly of the A/C Head ASS’Y Fig

Page 13

DEASSEMBLY AND REPLACEMENT (CONTINUED)

4.Deassembly of LOADING RACK, LOADING ASS’Y, S/T SLANT POLE ASS’Y (Fig. 3.7, 3.8)

a.Turn out the DECK MECHANISM and remove the LOADING RACK@after unscrewing the SCREW !.

b.Disintegrate the R LOADING AS #and L LOADING AS $.

c.Disintegrate the S SLANT POLE AS %and T SLANT POLE AS ^by moving those part in arrow direction.

CAUTION:

Take care GUIDE ROLLER of S/T SLANT POLE AS and SLANT POLE not to be stained with grease during assembly.

Refer to Fig. 3.8 in assembly.

FIg. 3.7 Deassembly of the LOADING RACK, LOADING

ASS’Y and the SLANT POLE ASS’Y

FIg. 3.8 Assembly of the L/R LOADING AS and the

LOADING RACK

5. Deassembly of the A/C HEAD ASS’Y (Fig. 3.9)

a.Remove the CONNECTOR @from the AC HEAD Ass’y, watch out that there is no damage in the HEAD connecting PIN.

b.Separate the AC HEAD Ass’y !after unscrewing the screw #.

CAUTION:

After the assembly, adjust the tape transmission section by refering to the chapter 5.

After the adjustment of the tape transmission section, paint the 3 adjustment screw with locking paint.

FIg. 3.9 Deassembly of the AC HEAD ASS’Y

12

Image 13
Contents VCR Mechanism Unit Contents Assembly diagram Deck Assembly diagram A. Upper View Assembly Diagram and A/SLower View Front Loading Assembly diagram Wire Diagram Connector Pin Arrangement Wire DiagramPeriodic Maintenance and Service Schedule Periodic Maintenance and Service ScheduleService Schedule for the Major Parts Service Schedule for the Major PartsList of Jigs and Tools Jigs and ToolsSketch of Jigs and Tools Deassembly of Front Loading Ass’y .2~3.5 Deassembly and ReplacementRemoval of the Front Loading Ass’y Fig Deassembly of the Cassette Holder Ass’y Deassembly of Drum Ass’y FigDeassembly of the Loading RACK, Loading Deassembly of the A/C Head ASS’Y Fig10 Deassembly of the LC Bracket ASS’Y from Deassembly of the CAM GEAR, Relay LEVER, FL Rack FigDeassembly of the Capstan Motor Fig Deassembly of the Tension Band ASS’Y FigDeassembly of the FE Head Fig Deassembly of the Reel TABLE, Idler Plate Total ASS’Y Fig Deassembly of the Reel Brkt Total ASS’Y, Connect Plate FigMechanical Adjustment .1~4.4 Mechanical AdjustmentAssembly reference between the Loading Rack Adjustment and measurement of the Back Tension .5Adjustment of the position of the Tension Pole Fig Mechanical Mode Operate without a cassette tapeA schematic diagram of the tape transporting section Adjustment of the Tpae Transporting SectionCleaning Adjustment of the Tpae Transporting SystemAdjustment of the AC Head ASS’YTILT Adjustment of the S/T Guide RollerAdjustment of the AC Head HeightFig Adjustment of the Audio AZIMUTHFigAdjustment of the LINEARITYFig Playback Phase ADJUSTMENTFigReview Adjustment of the wave form of Drum Entrance / Exit FigPosition Adjustment of the Audio AzimuthExploded view of Deck Ass’y Top View Exploded View and Parts ListExploded view of Deck Ass’y Bottom View Exploded view of FL Ass’y Exploded view Drum Total Ass’y D0040 D0020 D0050 D0010 D0060 D0070LOC Part S/N Part Name Part Discription Ntsc M1OOO Parts List of Deck Total Ass’y continud Parts List of Deck Total Ass’y LOC Part S/N Part Name Part Discription Ntsc Mail G7F00E@web.dwe.co.kr TEL FAX