Daewoo VCR MECHANISM UNIT service manual List of Jigs and Tools

Page 9

JIGS AND TOOLS

1. List of Jigs and Tools

NO

ITEMS

MODEL

FIG.

REMARKS

 

N O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NTSC: SP MONOSCOPE 7KHz

 

CHECKING OF THE

 

1

ALIGNMENT TAPE

SP COLORBAR 1KHz

!

TAPE TRANSPORTING

 

 

 

(EP MONOSCOPE)

 

SYSTEM

 

 

 

PAL/SCAM: SP MONOSCOPE 6KHz

 

 

 

 

 

SP COLORBAR 1KHz

 

 

 

 

 

(LP MONOSCOPE)

 

 

 

 

 

 

 

 

 

2

CLEANING TAPE

DHC-602V

@

CHECKING OF THE TAPE

 

(DAEWOO)

TRANSPORTING SYSTEM

 

 

 

 

 

 

 

 

 

 

 

3

CASSETTE TAPE

KT-300NV

#

MEASUREMENT OF

 

(KOKUSAI)

KT-300RV

REEL TORQUE

 

 

 

 

 

 

 

 

 

 

4

VHS SPINDLE

TSH-V4

$

MEASUREMENT OF

 

HEIGHT GAUGE

REEL HEIGHT

 

 

 

 

 

 

 

 

 

 

 

5

TENTELO METER

T2-H7-UM

%

MEASUREMENT OF

 

(TENTELO)

THE BACK TENSION

 

 

 

 

 

 

 

 

 

 

 

 

FAN TYPE

 

 

MEASUREMENT OF THE

 

6

TENSION METER

BELOW 3KG

^

PRESSING FORCE FOR

 

 

 

 

 

THE PINCH ROLLER

 

 

 

 

 

 

 

7

DENTAL MIRROR

 

&

CHECKING OF THE TAPE

 

 

TRANSPORTING SYSTEM

 

 

 

 

 

 

 

 

 

 

 

 

8

+DRIVER

 

*-1

ASSEMBLY,

 

 

 

 

 

DISASSEMBLY

 

 

 

 

 

 

 

ADJUSTMENT DR IVER

 

*-2

AND ADJUSTMENT

 

 

 

 

 

 

 

8

Image 9
Contents VCR Mechanism Unit Contents Assembly diagram Deck Assembly diagram A. Upper View Assembly Diagram and A/SLower View Front Loading Assembly diagram Wire Diagram Connector Pin Arrangement Wire DiagramPeriodic Maintenance and Service Schedule Periodic Maintenance and Service ScheduleService Schedule for the Major Parts Service Schedule for the Major PartsList of Jigs and Tools Jigs and ToolsSketch of Jigs and Tools Deassembly and Replacement Deassembly of Front Loading Ass’y .2~3.5Removal of the Front Loading Ass’y Fig Deassembly of the Cassette Holder Ass’y Deassembly of Drum Ass’y FigDeassembly of the Loading RACK, Loading Deassembly of the A/C Head ASS’Y Fig10 Deassembly of the LC Bracket ASS’Y from Deassembly of the CAM GEAR, Relay LEVER, FL Rack FigDeassembly of the Tension Band ASS’Y Fig Deassembly of the Capstan Motor FigDeassembly of the FE Head Fig Deassembly of the Reel TABLE, Idler Plate Total ASS’Y Fig Deassembly of the Reel Brkt Total ASS’Y, Connect Plate FigMechanical Adjustment .1~4.4 Mechanical AdjustmentAssembly reference between the Loading Rack Adjustment and measurement of the Back Tension .5Adjustment of the position of the Tension Pole Fig Mechanical Mode Operate without a cassette tapeA schematic diagram of the tape transporting section Adjustment of the Tpae Transporting SectionCleaning Adjustment of the Tpae Transporting SystemAdjustment of the AC Head ASS’YTILT Adjustment of the S/T Guide RollerAdjustment of the AC Head HeightFig Adjustment of the Audio AZIMUTHFigAdjustment of the LINEARITYFig Playback Phase ADJUSTMENTFigReview Adjustment of the wave form of Drum Entrance / Exit FigPosition Adjustment of the Audio AzimuthExploded view of Deck Ass’y Top View Exploded View and Parts ListExploded view of Deck Ass’y Bottom View Exploded view of FL Ass’y Exploded view Drum Total Ass’y D0040 D0020 D0050 D0010 D0060 D0070LOC Part S/N Part Name Part Discription Ntsc M1OOO Parts List of Deck Total Ass’y continud Parts List of Deck Total Ass’y LOC Part S/N Part Name Part Discription Ntsc Mail G7F00E@web.dwe.co.kr TEL FAX