Daewoo VCR MECHANISM UNIT Deassembly of the Tension Band ASS’Y Fig, Deassembly of the FE Head Fig

Page 15

DEASSEMBLY AND REPLACEMENT (CONTINUED)

8. Deassembly of the S/T BRAKE ASS’Y (Fig. 3.13)

a.Unhook the S BRAKE SPRING #from the MAIN- BASE HOOK !.

b.Remove the S BRAKE Ass’y @from the mainbase.

c.Remove the T BRAKE SPRING ^from the MAIN- BASE HOOK $.

d.Remove the T BRAKE Ass’y %.

FIg. 3.13 Deassembly of the S/T BRAKE ASS’Y

9.Deassembly of the TENSION BAND ASS’Y (Fig. 3.14)

a.Unhook the TENSION SPRING @from the MAIN- BASE HOOK !.

b.Unhook the MAINBASE HOOK “A” and remove the TENSION BAND Ass’y #from the mainbase.

CAUTION:

After the assembly of TENSION BAND Ass’y on the mainbase, adjust the TENSION POLE location as shown in Fig. 3.15.

Avoid getting Grease, Oil or Foreign substance on the FELT of the BAND BRAKE.

Take care not to deform the MAINBASE HOOK “A” when separating the TENSION BAND Ass’y #.

10.Deassembly of the Capstan Motor (Fig. 3.14)

a.Separate the CAPSTAN MOTOR %after the removal of 3 screw $holding the capstan motor.

11. Deassembly of the FE HEAD (Fig. 3.14)

a.Unscrew the screw ^and separate the FE HEAD & from the MAINBASE.

FIg. 3.14 Deassembly of the TENSION BAND ASS’Y,

CAPSTAN MOTOR and the FE HEAD

FIg. 3.15 Adjustment of the TENSION POLE POSITION

14

Image 15
Contents VCR Mechanism Unit Contents Assembly diagram Deck Assembly diagram A. Upper View Assembly Diagram and A/SLower View Front Loading Assembly diagram Wire Diagram Connector Pin Arrangement Wire DiagramPeriodic Maintenance and Service Schedule Periodic Maintenance and Service ScheduleService Schedule for the Major Parts Service Schedule for the Major PartsList of Jigs and Tools Jigs and ToolsSketch of Jigs and Tools Deassembly and Replacement Deassembly of Front Loading Ass’y .2~3.5Removal of the Front Loading Ass’y Fig Deassembly of the Cassette Holder Ass’y Deassembly of Drum Ass’y FigDeassembly of the Loading RACK, Loading Deassembly of the A/C Head ASS’Y Fig10 Deassembly of the LC Bracket ASS’Y from Deassembly of the CAM GEAR, Relay LEVER, FL Rack FigDeassembly of the Tension Band ASS’Y Fig Deassembly of the Capstan Motor FigDeassembly of the FE Head Fig Deassembly of the Reel TABLE, Idler Plate Total ASS’Y Fig Deassembly of the Reel Brkt Total ASS’Y, Connect Plate FigMechanical Adjustment .1~4.4 Mechanical AdjustmentAssembly reference between the Loading Rack Adjustment and measurement of the Back Tension .5Adjustment of the position of the Tension Pole Fig Mechanical Mode Operate without a cassette tapeA schematic diagram of the tape transporting section Adjustment of the Tpae Transporting SectionCleaning Adjustment of the Tpae Transporting SystemAdjustment of the Audio AZIMUTHFig Adjustment of the S/T Guide RollerAdjustment of the AC Head ASS’YTILT Adjustment of the AC Head HeightFigAdjustment of the LINEARITYFig Playback Phase ADJUSTMENTFigReview Adjustment of the wave form of Drum Entrance / Exit FigPosition Adjustment of the Audio AzimuthExploded view of Deck Ass’y Top View Exploded View and Parts ListExploded view of Deck Ass’y Bottom View Exploded view of FL Ass’y Exploded view Drum Total Ass’y D0040 D0020 D0050 D0010 D0060 D0070LOC Part S/N Part Name Part Discription Ntsc M1OOO Parts List of Deck Total Ass’y continud Parts List of Deck Total Ass’y LOC Part S/N Part Name Part Discription Ntsc Mail G7F00E@web.dwe.co.kr TEL FAX