Daewoo VCR MECHANISM UNIT service manual Deassembly of the CAM GEAR, Relay LEVER, FL Rack Fig

Page 14

DEASSEMBLY AND REPLACEMENT (CONTINUED)

6.Deassembly of the LC BRKT ASS’Y, PINCH LEVER TOTAL ASS’Y (Fig. 3.10)

a.Separate the LC BRKT Ass’y @after removing the 3 screw !.

b.Separate the LC BRKT Ass’y @from the DECK MECHANISM.

c.Disintegrate the PINCH LEVER TOTAL Ass’y #.

CAUTION:

After the assembly of the PINCH LEVER TOTAL Ass’y, adjust the tape transmission section by refering to the chapter 5.

There should be no pollution on the surface of PINCH ROLLER $with grease or other foreign material.

Make sure if the end of the PINCH SPRING PINCH “A” is located at the end of trajectory of CAM GEAR “B” in assembly. (Refer to Fig. 4.3)

7.Deassembly of the CAM GEAR, RELAY LEVER, FL RACK (Fig. 3.10)

a.Separate the CAM GEAR %from the MAINBASE.

b.Separate the RELAY LEVER ^from the MAINBASE.

c.Separate the FL RACK &from MAINBASE by moving to the arrow direction.

CAUTION:

When reassembling, refer to Fig. 3.11, Fig. 3.12 and chapter 4.

FIg. 3.10 Deassembly of the LC BRACKET ASS’Y from

the PINCH LEVER TOTAL ASS’Y

FIg. 3.11 Assembly of the CAM GEAR, RELAY LEVER

FIg. 3.12 Assembly of the CAM GEAR, FL RACK

13

Image 14
Contents VCR Mechanism Unit Contents Assembly Diagram and A/S Assembly diagram Deck Assembly diagram A. Upper ViewLower View Front Loading Assembly diagram Wire Diagram Wire Diagram Connector Pin ArrangementPeriodic Maintenance and Service Schedule Periodic Maintenance and Service ScheduleService Schedule for the Major Parts Service Schedule for the Major PartsJigs and Tools List of Jigs and ToolsSketch of Jigs and Tools Removal of the Front Loading Ass’y Fig Deassembly and ReplacementDeassembly of Front Loading Ass’y .2~3.5 Deassembly of Drum Ass’y Fig Deassembly of the Cassette Holder Ass’yDeassembly of the A/C Head ASS’Y Fig Deassembly of the Loading RACK, LoadingDeassembly of the CAM GEAR, Relay LEVER, FL Rack Fig 10 Deassembly of the LC Bracket ASS’Y fromDeassembly of the FE Head Fig Deassembly of the Tension Band ASS’Y FigDeassembly of the Capstan Motor Fig Deassembly of the Reel Brkt Total ASS’Y, Connect Plate Fig Deassembly of the Reel TABLE, Idler Plate Total ASS’Y FigMechanical Adjustment Mechanical Adjustment .1~4.4Adjustment and measurement of the Back Tension .5 Assembly reference between the Loading RackMechanical Mode Operate without a cassette tape Adjustment of the position of the Tension Pole FigAdjustment of the Tpae Transporting Section A schematic diagram of the tape transporting sectionAdjustment of the Tpae Transporting System CleaningAdjustment of the AC Head HeightFig Adjustment of the S/T Guide RollerAdjustment of the AC Head ASS’YTILT Adjustment of the Audio AZIMUTHFigPlayback Phase ADJUSTMENTFig Adjustment of the LINEARITYFigAdjustment of the wave form of Drum Entrance / Exit Fig ReviewAdjustment of the Audio Azimuth PositionExploded View and Parts List Exploded view of Deck Ass’y Top ViewExploded view of Deck Ass’y Bottom View Exploded view of FL Ass’y D0040 D0020 D0050 D0010 D0060 D0070 Exploded view Drum Total Ass’yLOC Part S/N Part Name Part Discription Ntsc M1OOO Parts List of Deck Total Ass’y continud Parts List of Deck Total Ass’y LOC Part S/N Part Name Part Discription Ntsc Mail G7F00E@web.dwe.co.kr TEL FAX