Daewoo K3050MECHA service manual Service Schedule for the Major Parts, Name Periodic Service Time

Page 10

2-2-3) SERVICE SCHEDULE FOR THE MAJOR PARTS

The following parts should receive periodic service, according to the recommended intervals.

 

 

 

 

 

 

 

NAME

 

 

PERIODIC SERVICE (TIME)

 

 

 

 

 

 

 

1000

 

2000

3000

4000

5000

 

 

 

 

 

 

 

 

 

DRUM TOTAL ASS'Y

¡

 

¡

¡

¡

¡

 

 

 

 

 

 

 

CAPSTAN MOTOR

 

 

¡

 

 

 

 

 

 

 

 

 

 

L/C BRKT TOTAL ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

REEL BELT

 

 

 

 

 

 

 

 

 

 

 

 

 

IDLER PLATE TOTAL ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

REEL TABLE

 

 

 

 

 

 

 

 

 

 

 

 

 

T SUB BRAKE ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

TENSION BAND ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

S MAIN BRAKE ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

T MAIN BRAKE ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

PINCH ROLLER ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

AC HEAD ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

FE HEAD

 

 

 

 

 

 

 

 

 

 

 

 

 

REEL GEAR TOTAL ASS'Y

 

 

 

 

 

 

 

 

 

 

 

 

 

: Check and Replace if necessary.

: Replace

 

 

 

 

Note: Even though the unit is not used frequently, cleaning, lubrication and replacement of the belt should be undertaken every 2 years.

9

Image 10
Contents VCR Mechanism Unit Contents 1CHARACTERISTICOFTHEK30-DECKMECHANISM Descriptionofthemechanism2WIREDIAGRAM Wire DiagramConnector PIN Arrangement Assemblingdiagram Assembling Diagram of Deck Assy TOP ViewBottom View Parts Location of Front Loading Assy A. TOP View Front View Periodic Maintenance and Service Schedule PeriodicmaintenanceandservicescheduleCleaning and Lubrication Service Schedule for the Major Parts Name Periodic Service TimeJigsandtools List of Jigs and Tools Items Model RemarksSketch of Jigs and Tools Disassembly and Replacement Front Loading Assy Removal See FigDisassemblyofthefrontloadingassy SeeFig.3-2~3-6 Remove one screw holding the Prism Link L. Fig Insert Points TOP Plate DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7REELBELT,LOADINGRACKASSY,LOADINGASSY,S/TSLANTPOLEASSY Pinchlever A/CHEADASSYREMOVALSeeFig.3-10L/CBRACKETASSYREMOVALSeeFig.3-11 TOTALASSYREMOVALSee -11CAMGEAR,RELAYLEVERANDF/LRACKREMOVALSeeFig.3-11 S/TMAIN&SUBBRAKEASSYREMOVALSeeFig.3-14TENSIONBANDASSYREMOVALSeeFig.3-15,3-16 CAPSTANMOTORREMOVALSeeFig.3-18 IDLERPLATETOTALASSY&S/TREELTABLEREMOVALSeeFig.3-19FEHEADREMOVALSeeFig.3-20 REELGEARTOTALASSY&CONNECTPLATEREMOVALFig.3-21Mechanicaladjustment MECHANICALADJUSTMENTSeeFig.4-1~4-5Triangle Marks Must Meet Each Other Page BACKTENSIONMEASUREMENTSeeFig.4-6~4-7 Datum Hole TapeTensionpole Positionadjustment MechanicalmodeoperatingthevcrwithoutacassettetapeAdjustmentoftapetransportingsystem Adjustment of the S/T Guide Roller Adjustment of the A/C Head Assy Tilt Adjustment Position Adjustment Playback Phase Adjustment See Fig Linearity Adjustment Drum Entrance /EXIT See -8,5-9 Review ¤APLAY See Fig Audio Output A/C Head Tilt & Height Adjustment Position See Fig Exploded View and Parts List Exploded View of Deck Assy TOP ViewExplodedviewofdeckassybottomview EXPLODEDVIEWOFF/LASSY D0040 Parts List of Deck Total Assy LOC Stock no Part Name Description NtscLOC Stock no Part Name Description Secam Parts List of Drum Price ASS’Y Parts List of Drum Total ASS’Y LOC Stock no Part Name Description Drum ASLOC Stock no Part Name Description Mail G7F00E@web.dwe.co.kr TEL FAX