Daewoo K3050MECHA Insert Points TOP Plate, DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7

Page 16

NOTE:

Reassemble the FRONT LOADING MECHANISM in the reverse order. Confirm that the two bosses on the left side of the CASSETTE HOLDER AS are inserted into the groove on the left side of the top plate. Insert the two bosses on the right side of the cassette holder into the groove of the F/L BRAKCET R (Fig. 3-6)

INSERT POINTS

TOP PLATE

3-3.DRUMASS'Y/EARTHBRACKETASS'YREMOVAL(SeeFig.3-7)

a. Remove three screwsfixing the DRUM TOTAL ASSEMBLY.

b. Carefully lift the DRUM TOTAL ASSEMBLY from the DECK MECHANISM, taking care not to damage or touch the VIDEO HEAD.

NOTE:

After assembling the DRUM TOTAL ASSEMBLY, confirm that the TAPE runs smooth and refer to chapter 5

"ADJUSTMENT OF THE TAPE

TRANSPORTING SYSTEM".

When assembling the EARTH BRACKET ASSEMBLY, a 3x12 screw should be used and at the other parts, 3x10 screws should be used.

&

15

Image 16
Contents VCR Mechanism Unit Contents 1CHARACTERISTICOFTHEK30-DECKMECHANISM Descriptionofthemechanism2WIREDIAGRAM Wire DiagramConnector PIN Arrangement Assemblingdiagram Assembling Diagram of Deck Assy TOP ViewBottom View Parts Location of Front Loading Assy A. TOP View Front View Periodic Maintenance and Service Schedule PeriodicmaintenanceandservicescheduleCleaning and Lubrication Service Schedule for the Major Parts Name Periodic Service TimeJigsandtools List of Jigs and Tools Items Model RemarksSketch of Jigs and Tools Disassembly and Replacement Front Loading Assy Removal See FigDisassemblyofthefrontloadingassy SeeFig.3-2~3-6 Remove one screw holding the Prism Link L. Fig Insert Points TOP Plate DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7REELBELT,LOADINGRACKASSY,LOADINGASSY,S/TSLANTPOLEASSY A/CHEADASSYREMOVALSeeFig.3-10 L/CBRACKETASSYREMOVALSeeFig.3-11Pinchlever TOTALASSYREMOVALSee -11CAMGEAR,RELAYLEVERANDF/LRACKREMOVALSeeFig.3-11 S/TMAIN&SUBBRAKEASSYREMOVALSeeFig.3-14TENSIONBANDASSYREMOVALSeeFig.3-15,3-16 CAPSTANMOTORREMOVALSeeFig.3-18 IDLERPLATETOTALASSY&S/TREELTABLEREMOVALSeeFig.3-19FEHEADREMOVALSeeFig.3-20 REELGEARTOTALASSY&CONNECTPLATEREMOVALFig.3-21Mechanicaladjustment MECHANICALADJUSTMENTSeeFig.4-1~4-5Triangle Marks Must Meet Each Other Page BACKTENSIONMEASUREMENTSeeFig.4-6~4-7 Datum Hole TapeTensionpole Positionadjustment MechanicalmodeoperatingthevcrwithoutacassettetapeAdjustmentoftapetransportingsystem Adjustment of the S/T Guide Roller Adjustment of the A/C Head Assy Tilt Adjustment Position Adjustment Playback Phase Adjustment See Fig Linearity Adjustment Drum Entrance /EXIT See -8,5-9 Review ¤APLAY See Fig Audio Output A/C Head Tilt & Height Adjustment Position See Fig Exploded View and Parts List Exploded View of Deck Assy TOP ViewExplodedviewofdeckassybottomview EXPLODEDVIEWOFF/LASSY D0040 Parts List of Deck Total Assy LOC Stock no Part Name Description NtscLOC Stock no Part Name Description Secam Parts List of Drum Price ASS’Y Parts List of Drum Total ASS’Y LOC Stock no Part Name Description Drum ASLOC Stock no Part Name Description Mail G7F00E@web.dwe.co.kr TEL FAX