Daewoo K3050MECHA service manual Jigsandtools, List of Jigs and Tools Items Model Remarks

Page 11

2-3.JIGSANDTOOLS

2-3-1) LIST OF JIGS AND TOOLS

NO

ITEMS

MODEL

FIG.

REMARKS

N O

 

 

 

 

 

 

 

 

 

 

 

NTSC: SP MONOSCOPE 7KHz

 

CHECKING OF THE

1

ALIGNMENT TAPE

SP COLORBAR 1KHz

 

TAPE TRANSPORTING

 

 

(EP MONOSCOPE)

 

SYSTEM

 

 

PAL/SCAM: SP MONOSCOPE 6KHz

 

 

 

 

SP COLORBAR 1KHz

 

 

 

 

(LP MONOSCOPE)

 

 

 

 

 

 

 

2

CLEANING TAPE

DHC-602V

 

CHECKING OF THE TAPE

(DAEWOO)

 

TRANSPORTING SYSTEM

 

 

 

 

 

 

 

 

3

CASSETTE TAPE

KT-300NV

 

MEASUREMENT OF

(KOKUSAI)

KT-300RV

 

REEL TORQUE

 

 

 

 

 

 

 

4

VHS SPINDLE

TSH-V4

 

MEASUREMENT OF

HEIGHT GAUGE

 

REEL HEIGHT

 

 

 

 

 

 

 

 

5

TENTELO METER

T2-H7-UM

 

MEASUREMENT OF

(TENTELO)

 

THE BACK TENSION

 

 

 

 

 

 

 

 

 

FAN TYPE

 

 

MEASUREMENT OF THE

6

TENSION METER

BELOW 3KG

 

PRESSING FORCE FOR

 

 

 

 

THE PINCH ROLLER

 

 

 

 

 

7

DENTAL MIRROR

 

 

CHECKING OF THE TAPE

 

 

TRANSPORTING SYSTEM

 

 

 

 

 

 

 

 

 

 

+DRIVER

 

-1

 

 

 

 

 

ASSEMBLY,

8

HEX DRIVER

 

 

 

-2

DISASSEMBLY

 

 

 

 

AND ADJUSTMENT

 

ADJUSTMENT DR IVER

 

-3

 

 

 

 

 

 

 

 

 

 

 

 

 

10

Image 11
Contents VCR Mechanism Unit Contents Descriptionofthemechanism 1CHARACTERISTICOFTHEK30-DECKMECHANISMWire Diagram 2WIREDIAGRAMConnector PIN Arrangement Assembling Diagram of Deck Assy TOP View AssemblingdiagramBottom View Parts Location of Front Loading Assy A. TOP View Front View Cleaning and Lubrication PeriodicmaintenanceandserviceschedulePeriodic Maintenance and Service Schedule Name Periodic Service Time Service Schedule for the Major PartsList of Jigs and Tools Items Model Remarks JigsandtoolsSketch of Jigs and Tools Front Loading Assy Removal See Fig Disassembly and ReplacementDisassemblyofthefrontloadingassy SeeFig.3-2~3-6 Remove one screw holding the Prism Link L. Fig DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7 Insert Points TOP PlateREELBELT,LOADINGRACKASSY,LOADINGASSY,S/TSLANTPOLEASSY TOTALASSYREMOVALSee -11 A/CHEADASSYREMOVALSeeFig.3-10L/CBRACKETASSYREMOVALSeeFig.3-11 PinchleverS/TMAIN&SUBBRAKEASSYREMOVALSeeFig.3-14 CAMGEAR,RELAYLEVERANDF/LRACKREMOVALSeeFig.3-11TENSIONBANDASSYREMOVALSeeFig.3-15,3-16 IDLERPLATETOTALASSY&S/TREELTABLEREMOVALSeeFig.3-19 CAPSTANMOTORREMOVALSeeFig.3-18REELGEARTOTALASSY&CONNECTPLATEREMOVALFig.3-21 FEHEADREMOVALSeeFig.3-20MECHANICALADJUSTMENTSeeFig.4-1~4-5 MechanicaladjustmentTriangle Marks Must Meet Each Other Page Datum Hole Tape BACKTENSIONMEASUREMENTSeeFig.4-6~4-7Mechanicalmodeoperatingthevcrwithoutacassettetape Tensionpole PositionadjustmentAdjustmentoftapetransportingsystem Adjustment of the S/T Guide Roller Adjustment of the A/C Head Assy Tilt Adjustment Position Adjustment Playback Phase Adjustment See Fig Linearity Adjustment Drum Entrance /EXIT See -8,5-9 Review ¤APLAY See Fig Audio Output A/C Head Tilt & Height Adjustment Position See Fig Exploded View of Deck Assy TOP View Exploded View and Parts ListExplodedviewofdeckassybottomview EXPLODEDVIEWOFF/LASSY D0040 LOC Stock no Part Name Description Ntsc Parts List of Deck Total AssyLOC Stock no Part Name Description Secam Parts List of Drum Price ASS’Y LOC Stock no Part Name Description Drum AS Parts List of Drum Total ASS’YLOC Stock no Part Name Description Mail G7F00E@web.dwe.co.kr TEL FAX