Daewoo K3050MECHA service manual

Page 25

e. Make sure that the triangular mark "A" on the L LOADING ASSEMBLY is aligned with the notch "B" on the R LOADING ASSEMBLY as shown in Fig. 4-5.

f. Make sure that the teeth of the LOADING RACK ASSEMBLY are aligned with those of the R LOADING ASSEMBLY so that the hole of the LOADING RACK ASSEMBLY aligns with the circular mark on the R LOADING ASSEMBLY, as shown in Fig.4-5.

24

Image 25
Contents VCR Mechanism Unit Contents Descriptionofthemechanism 1CHARACTERISTICOFTHEK30-DECKMECHANISMWire Diagram 2WIREDIAGRAMConnector PIN Arrangement Assembling Diagram of Deck Assy TOP View AssemblingdiagramBottom View Parts Location of Front Loading Assy A. TOP View Front View Periodic Maintenance and Service Schedule PeriodicmaintenanceandservicescheduleCleaning and Lubrication Name Periodic Service Time Service Schedule for the Major PartsList of Jigs and Tools Items Model Remarks JigsandtoolsSketch of Jigs and Tools Front Loading Assy Removal See Fig Disassembly and ReplacementDisassemblyofthefrontloadingassy SeeFig.3-2~3-6 Remove one screw holding the Prism Link L. Fig DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7 Insert Points TOP PlateREELBELT,LOADINGRACKASSY,LOADINGASSY,S/TSLANTPOLEASSY L/CBRACKETASSYREMOVALSeeFig.3-11 A/CHEADASSYREMOVALSeeFig.3-10Pinchlever TOTALASSYREMOVALSee -11S/TMAIN&SUBBRAKEASSYREMOVALSeeFig.3-14 CAMGEAR,RELAYLEVERANDF/LRACKREMOVALSeeFig.3-11TENSIONBANDASSYREMOVALSeeFig.3-15,3-16 IDLERPLATETOTALASSY&S/TREELTABLEREMOVALSeeFig.3-19 CAPSTANMOTORREMOVALSeeFig.3-18REELGEARTOTALASSY&CONNECTPLATEREMOVALFig.3-21 FEHEADREMOVALSeeFig.3-20MECHANICALADJUSTMENTSeeFig.4-1~4-5 MechanicaladjustmentTriangle Marks Must Meet Each Other Page Datum Hole Tape BACKTENSIONMEASUREMENTSeeFig.4-6~4-7Mechanicalmodeoperatingthevcrwithoutacassettetape Tensionpole PositionadjustmentAdjustmentoftapetransportingsystem Adjustment of the S/T Guide Roller Adjustment of the A/C Head Assy Tilt Adjustment Position Adjustment Playback Phase Adjustment See Fig Linearity Adjustment Drum Entrance /EXIT See -8,5-9 Review ¤APLAY See Fig Audio Output A/C Head Tilt & Height Adjustment Position See Fig Exploded View of Deck Assy TOP View Exploded View and Parts ListExplodedviewofdeckassybottomview EXPLODEDVIEWOFF/LASSY D0040 LOC Stock no Part Name Description Ntsc Parts List of Deck Total AssyLOC Stock no Part Name Description Secam Parts List of Drum Price ASS’Y LOC Stock no Part Name Description Drum AS Parts List of Drum Total ASS’YLOC Stock no Part Name Description Mail G7F00E@web.dwe.co.kr TEL FAX