Daewoo K3050MECHA service manual Connector PIN Arrangement

Page 5

1-2-2) CONNECTOR PIN ARRANGEMENT

CN-1 (2 HEAD MONO)

1SP-L

2COMMON

3SP-R

4GND

CN-1 (4 HEAD MONO)

1SP-L

2COMMON

3SP-R

4GND

5EP-R

6COMMON

7EP-L

CN-1 (4 HEAD HI-FI)

1

A-L

2

COMMON

3

A-R

4

SP-L

5

COMMON

6

SP-R

7

GND

8

EP-R

9

COMMON

10

EP-L

 

 

CN-A

1

GND

2

DRUM SPD CTL

3

Vcc

4

DRUM FG

5

DRUM PG

6

NON CONNECT

7

NON CONNECT

CN-B

1FE HEAD

2GND

CN-C

1L/C MT (+)

2L/C MT (–)

3GND

4CAM D

5CAM C

6CAM B

7CAM A

CN-D

1CTL

2CTL

3AUDIO

4AUDIO

5ERASE

6GND

CN-2

1

EVER 5V

2

CAPSTAN F/R

3

CAPSTAN FG

4

CTL-REF

5

CTL

6

I-LIMIT

7

CAPSTAN M/T 12V/18V

8

GND

9

IC GND

10

NON CONTACT

 

 

Capstan M/T Voltage of No.7 is 12V for normal model and 18V for HI- REW model.

4

Image 5
Contents VCR Mechanism Unit Contents Descriptionofthemechanism 1CHARACTERISTICOFTHEK30-DECKMECHANISMWire Diagram 2WIREDIAGRAMConnector PIN Arrangement Assembling Diagram of Deck Assy TOP View AssemblingdiagramBottom View Parts Location of Front Loading Assy A. TOP View Front View Cleaning and Lubrication PeriodicmaintenanceandserviceschedulePeriodic Maintenance and Service Schedule Name Periodic Service Time Service Schedule for the Major PartsList of Jigs and Tools Items Model Remarks JigsandtoolsSketch of Jigs and Tools Front Loading Assy Removal See Fig Disassembly and ReplacementDisassemblyofthefrontloadingassy SeeFig.3-2~3-6 Remove one screw holding the Prism Link L. Fig DRUMASSY/EARTHBRACKETASSYREMOVALSeeFig.3-7 Insert Points TOP PlateREELBELT,LOADINGRACKASSY,LOADINGASSY,S/TSLANTPOLEASSY L/CBRACKETASSYREMOVALSeeFig.3-11 A/CHEADASSYREMOVALSeeFig.3-10Pinchlever TOTALASSYREMOVALSee -11S/TMAIN&SUBBRAKEASSYREMOVALSeeFig.3-14 CAMGEAR,RELAYLEVERANDF/LRACKREMOVALSeeFig.3-11TENSIONBANDASSYREMOVALSeeFig.3-15,3-16 IDLERPLATETOTALASSY&S/TREELTABLEREMOVALSeeFig.3-19 CAPSTANMOTORREMOVALSeeFig.3-18REELGEARTOTALASSY&CONNECTPLATEREMOVALFig.3-21 FEHEADREMOVALSeeFig.3-20MECHANICALADJUSTMENTSeeFig.4-1~4-5 MechanicaladjustmentTriangle Marks Must Meet Each Other Page Datum Hole Tape BACKTENSIONMEASUREMENTSeeFig.4-6~4-7Mechanicalmodeoperatingthevcrwithoutacassettetape Tensionpole PositionadjustmentAdjustmentoftapetransportingsystem Adjustment of the S/T Guide Roller Adjustment of the A/C Head Assy Tilt Adjustment Position Adjustment Playback Phase Adjustment See Fig Linearity Adjustment Drum Entrance /EXIT See -8,5-9 Review ¤APLAY See Fig Audio Output A/C Head Tilt & Height Adjustment Position See Fig Exploded View of Deck Assy TOP View Exploded View and Parts ListExplodedviewofdeckassybottomview EXPLODEDVIEWOFF/LASSY D0040 LOC Stock no Part Name Description Ntsc Parts List of Deck Total AssyLOC Stock no Part Name Description Secam Parts List of Drum Price ASS’Y LOC Stock no Part Name Description Drum AS Parts List of Drum Total ASS’YLOC Stock no Part Name Description Mail G7F00E@web.dwe.co.kr TEL FAX