
4.MECHANICALADJUSTMENT
4-1.MECHANICALADJUSTMENT(See Fig.4-1~4-5)
When operational problems occur or the mechanism is reassembled, be sure to confirm the following
INSTRUCTIONS.
a. Make sure that the DATUM HOLE of the CAM GEAR is aligned with the DATUM HOLE in the MAINBASE in the EJECT mode, as shown in
CAM GEAR
DATUM HOLE OF CAM GEAR
DATUM HOLE OF MAIN BASE
F/L RACK
b. Make sure that part "A" of the RELAY LEVER, when assembled in the CONNECT PLATE, is fully rotated to the left side of "B" of the MAINBASE, and is touching boss "C" of the MAINBASE as, shown in
22