1

#57923 Hose Kit Cont’d

￿￿￿￿￿￿

Verification of Control Movements

1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.

2.Connect loader feedline hoses to tractor hydraulic couplers. See Figure 11.

NOTE: At least 6” spacing should be maintained between valve, bracket, or hoses and any tractor control (brake pedals, accelerator, hand throttle, or hydraulic levers).

3.Comply with all Safety Rules and start the trac-

tor.

4.Check that all hydraulic control lever positions operate the loader movements correctly as shown in Figure 10.

5.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be cor- rect before proceeding.

6.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system.

7.When hose routings and correct loader opera- tions are verified, identify each circuit by placing a matching colored band around the male and female quick-disconnect coupler set. The colored bands will make re-installation easier when the loader is removed from the tractor.

8.Be sure that adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.

9.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Check- lists from the Operator section in the Loader Opera- tor’s Manual have been completed.

￿￿ ￿￿

Figure 10 Single Lever Control Operation

Control #1 Handle Forward - Boom down

Control #1 Handle back - Boom up

Control #2 Handle forward - Dump bucket or attachment

Control #2 Handle back - Roll back bucket or attachment

$￿ %8&.(7 &</￿ %$6( (1' ￿'803￿

%￿ %8&.(7 &</￿ 52' (1' ￿52//%$&.￿

&￿ %220 &</￿ 52' (1' ￿'2:1￿

'￿ %220 &</￿ %$6( (1' ￿83￿

%$

 

5+

 

/2$'(5

'

%220

&

Figure 11 Loader Feedline Connections

14 Hydraulic Installation

MAN0063 (12/15/00)

 

Image 16
Contents MAN0063 Model 111876 Loader Mounting Kit To the DealerSafety Rules InstallationTraining PreparationMaintenance OperationSafety Safety & Instructional Decals Replace Immediately If DamagedCrushing Hazard Mount Installation Loader Mount Installation Tractor PreparationLoader Mount Installation Cont’d Install Front SupportInstall Grill Guard Optional Install Right & Left Mounts to Clutch HousingAttach Side Rails to Rear Mounts & Front Support Torque HardwareHydraulic Installation Install Hose Fittings General Description#57923 Hose Kit Cont’d Install #58033 Hose HangerRoute Hydraulic Hoses Verification of Control Movements Loader Feedline Connections#46675 Control Valve Kit & #1001420 Hose Kit #46675 Control Valve & #1001420 Hose Kit Cont’d Assemble Control Valve KitInstall #1001421 Adapter Plate from Hose Kit Adapter Plate Installation 3930 shownInstall Hydraulic Hoses #46675 Control Valve & #1001420 Hose KitInstall #58033 Hose Hanger Bracket 911Connect OUT Hose to Tractor Rear Axle Connect in & PBY Hoses to Adapter PlateConnect Work Port Hoses #46675 Control Valve & Loader Feedline ConnectionsVerification of Control Movements Parts #111876 Loader Mounting KIT Part QTY DescriptionFor USE with Tractor Remote Control #57923 Hose KITSpool Control Valve Spool Control Valve Parts List REF Part QTY Description#1001420 Hose KIT For 1020/1027 Loaders SAE Series Torque Chart Bolt Torque ChartMetric Series Bolt Size Chart Abbreviations JICWarranty Replacement Parts For All Models Except Mow’n Machines