1
#57923 Hose Kit Cont’d |
Verification of Control Movements
1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.
2.Connect loader feedline hoses to tractor hydraulic couplers. See Figure 11.
NOTE: At least 6” spacing should be maintained between valve, bracket, or hoses and any tractor control (brake pedals, accelerator, hand throttle, or hydraulic levers).
3.Comply with all Safety Rules and start the trac-
tor.
4.Check that all hydraulic control lever positions operate the loader movements correctly as shown in Figure 10.
5.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be cor- rect before proceeding.
6.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system.
7.When hose routings and correct loader opera- tions are verified, identify each circuit by placing a matching colored band around the male and female
8.Be sure that adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.
9.Before operating the loader, make sure that the
Figure 10 Single Lever Control Operation
●Control #1 Handle Forward - Boom down
●Control #1 Handle back - Boom up
●Control #2 Handle forward - Dump bucket or attachment
●Control #2 Handle back - Roll back bucket or attachment
$ %8&.(7 &</ %$6( (1' '803
% %8&.(7 &</ 52' (1' 52//%$&.
& %220 &</ 52' (1' '2:1
' %220 &</ %$6( (1' 83
%$
| 5+ |
| /2$'(5 |
' | %220 |
& |
Figure 11 Loader Feedline Connections
14 Hydraulic Installation | MAN0063 (12/15/00) |
|