Sterling 1-Pump 5-Station Controller service manual Using the Controller, Introduction, Setup

Page 22

5

Using the Controller

 

 

5-1 Introduction

This chapter gives the procedures for configuring your

SSC1-5Q controller.

Configuration of your SSC1-50Q controller includes setting the number of stations, setting variables such as convey time and blow-back interval. Sterling recommends that you carry out these procedures in the order given here.

5-2 Setup

Important! Before carrying out these procedures, install all equipment as described in Chapter 4: “Installation”, and in the manual SPD/SPC Series Conveying Systems.

5-2-1 Setting Up the System

This section provides an overview of the controller screens used in configuring the system. Section 6 provides a detailed explanation of the features listed on each screen.

5-2-1-1 Basic Menus and Setup of Controller

Once power has been applied to a properly installed system, turn the disconnect switch to the ON position. The alpha controller will display the screen for receiver 1 (Hopper 1).

Page 21 of 38

Image 22
Contents SSC1-5Q Model # Serial # Parts and Service Department Table of Contents Configurable Settings Charts and Figures Safety Considerations Sterling SSC1-5Q Conveying Systems Pump 5-Station Controller Necessary Documents General InformationEquipment Function System CapabilitiesModels Covered by this Manual Equipment CycleSSC1-5Q 5-Station Controller SSC1-5Q Controller Work Rules SafetySafety Considerations Tools and Equipment NeededReporting a Safety Defect General ResponsibilityMaintenance Responsibility Operator ResponsibilitySafety Circuit Standards Safety DevicesFail Safe Operation Safety Device Lock-Outs Page Event of Shipping Damages Shipping InformationUnpacking and Inspection Parcel Post ShipmentIf the Shipment is Not Correct United Parcel Service ShipmentIf the Shipment is Not Complete ReturnsMaking SSC1-5Q Control Panel Power Drop Wiring Connections InstallationInstalling the SCC1-5Q Control Panel Connecting the Control Panel to Vacuum ReceiversConnecting the Control Panel to the Pump Package Special Timed ConveySetting Up the System Using the ControllerSetup Basic Menus and Setup of ControllerSetting Pump Parameters Setting Blowback ParametersChanging Parameters Starting the SystemHigh vaccum alarm will sound in Short Tones Long Tones6Configurable Settings Options for Station SetupOptions for Pump Setup Idle7Maintenance Troubleshooting General TroubleshootingStation Alarms AlarmsPump Alarms 230/1/60 Operation Remote Audible/visual alarmOptions CE Package for 220/1/50 OperationSpare Parts List Recommended Spare Parts ListTechnical Assistance Contact Information for Technical AssistanceReturned Material Policy Warranty ReturnsCredit Returns Warranty Controller Safety Tags Safety Tag InformationController Identification Serial Number Tag Appendix Page Service Department