Light & Motion TITAN D100 manual Replacing Handle Thread Rings, Moisture Alarm

Page 12

(Fig. 55)

(Fig. 57)

(Fig. 59)

(Fig. 56)

(Fig. 58)

Replacing Handle Thread Rings

The Handle Thread Rings that attach the ROC handles (Fig. 57) to the Titan housing are designed to absorb shock should the Titan be dropped or fall. If the Handle Thread Rings experience extreme pressure, they will break and minimize potential damage to the Titan.

Contact your dealer for a Handle Thread Ring Replacement Kit (p/n 802-0147) or contact the Light & Motion Service department at 831-645-1572.

Follow the steps below to replace the Handle Thread Ring and reattach the handle.

1.Place new Handle Thread Ring over the handle dock of the Titan

2.Install the snap ring over the handle dock to retain the Handle Thread Ring (Fig. 58).

3.Align the handle with the opening of the thread ring.

4.Hand turn the thread ring counter-clockwise until the handle begins to tighten.

5.Use the supplied wrench to finish tightening the handle.

Handle Thread Ring Replacement Kit contains:

2 - Handle Thread Ring, 2 - snap rings and 1 - spanner wrench.

Moisture Alarm

The Titan’s moisture alarm (Fig. 59) gives a visual indication that water has been detect- ed inside of the housing.

The two metal contacts are located inside the Titan, in the front and slightly to the left (Fig. 59). If water touches these contacts the ROC LED panel will display an array of lights. Immediately move the Titan to a dry location.

The moisture alarm will continue it’s display of lights until it no longer detects water and one of the handle buttons is pressed.

If water touches the Moisture Alarm contact, clean throughly and check for corrosion.

Image 12
Contents Standard Warranty Fault Free Warranty OptionalTable of Contents WelcomeBattery Board Getting StartedFirst Time Use Camera PreparationInstalling the D100 Battery BoardTitan D100 Controls Top ControlsRear Plate Controls Left Side ControlsFront Controls Left Smart Grip FigRight Smart Grip Fig Installing Bulkheads Attaching StrobesAttaching Sync Cables to Titan Nikonos StylePre-Dive Checklist ROC and Focus ControlsUsing ROC for strobe control Using ROC for AE-L / AF-LChanging D100 Lenses Attaching Light & Motion Ports / Conversion RingsAttaching Light & Motion Lens gears Installing Mod Light Installing Sunray Mod Light OptionalInstalling the Pointer Light Optional Then snap Mod Light and arm assembly on the base FigMoisture Alarm Replacing Handle Thread RingsRing Care and Maintenance Titan D100 AccessoriesRemove housing from rinse tank and then simply towel dry After Diving CareReturning Products for Care Contact Light and MotionSales Department