6.2PREVENTATIVE MAINTENANCE SCHEDULE
Follow the schedule below to ensure proper operation of the product.
ITEM | WEEKLY |
| MONTHLY |
| QUARTERLY |
| ANNUAL |
|
|
|
|
|
|
| |
|
| DISPLAY CONSOLE ASSEMBLY |
|
| |||
|
|
|
|
|
|
|
|
Hardware |
|
|
|
| Inspect |
|
|
Overlay | Clean |
|
|
|
| Inspect |
|
Accessory Cups | Clean |
|
|
|
|
| Inspect |
Stop Switch | Clean/Inspect |
|
|
|
|
|
|
Emergency | Clean/Inspect |
|
|
|
|
|
|
Switch/Magnet |
|
|
|
|
|
|
|
|
|
| HANDLEBAR ASSEMBLY |
|
| ||
Hardware |
|
|
|
|
| Inspect |
|
ErgoTM Front Handlebar | Clean |
|
|
|
| Inspect |
|
Side Hand Rails | Clean |
|
|
|
| Inspect |
|
Lifepulse Sensors | Clean/Inspect |
|
|
|
|
|
|
|
|
| FRAME ASSEMBLY |
|
| ||
Hardware |
|
|
|
|
| Inspect |
|
Motor Cover | Clean |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Motor Electronic |
|
| Vacuum Clean |
|
| Inspect |
|
Compartment |
|
|
|
|
|
|
|
Drive Belt |
|
|
|
|
| Inspect |
|
Drive Belt |
|
| Inspect |
|
|
|
|
Bracket |
|
|
|
|
|
|
|
|
| Inspect |
|
|
|
| |
Cords |
|
|
|
|
|
|
|
Leg Levelers |
|
| Inspect/Adjust |
|
|
|
|
Front Roller |
|
|
|
|
| Inspect |
|
Rear Roller |
|
|
|
|
| Inspect |
|
Side Step Area | Clean |
|
|
| Inspect |
|
|
|
|
| GENERAL |
|
|
| |
Machine Level | *Inspect |
|
|
|
|
|
|
Striding Belt | Inspect |
|
|
|
|
|
|
Centered |
|
|
|
|
|
|
|
Frame, Toe Guards, |
|
| Visual Inspect |
|
|
|
|
Endcaps |
|
|
|
|
|
|
|
Tinsel | Visually Inspect if Treadmill has been Moved |
|
| ||||
| Replace Tinsel if Changing Belt and Deck |
|
| ||||
*Use bubble level to inspect |
|
|
|
|
|
|
32