Woodstock M1001 manual Maintenance Schedule, Maintenance Notes

Page 30

MAINTENANCE

M1001 6" x 26" Vertical Mill

Maintenance Schedule

Daily:

Pump handle of the one shot lubrication system 2-4 times.

Clean machine to remove debris.

Make sure table/vise is clean and free of metal chips.

Clean spindle openings before inserting tools.

Check for any unsafe conditions.

Weekly:

Place five drops of oil on the drawbar splines.

Thoroughly clean the machine ways to remove chips and debris.

Clean and grease the longitudinal, cross, and knee lead screws.

Monthly:

Clean/vacuum dust buildup from the motor.

Check mill for level, correct if necessary.

Every Six Months:

Inspect belts for wear, and replace as needed.

Maintenance Notes

 

 

 

 

DATE

MAINTENANCE PERFORMED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-28-

Image 30
Contents 26 Vertical Mill Page Table of Contents Introduction Woodstock Technical SupportAbout Your New 6 x 26 Vertical Mill Model M1001 Shop FOX Vertical Mill 6 X Lead Screw Info Electrical Controls and Features Safety Standard Machinery Safety InstructionsSafety Additional Safety Instructions for Vertical Mills Full-Load Current Rating ElectricalAvailability Full-Load Current Rating atCircuit Information Nominal Voltage 110V/120V Cycle 60 Hz PhaseNominal Voltage 220V/240V Cycle 60 Hz Phase Circuit Requirements forGrounding & Plug Requirements Extension CordsVoltage Conversion SET UP UnpackingInventory Machine Placement Cleaning Machine M1001 minimum working clearancesUsing Machine Mounts Mounting Mill on Shop FloorBolting to Concrete Floors Handle Installation AssemblyHeadstock Adjustment DrawbarTo begin the test run procedure, do these steps Spindle ControlsTest Run Operations GeneralPositioning Spindle Head Cross Feed Table TravelLongitudinal Feed Control Knee FeedPower Feed Controls Graduated DialsExample Quill Feed Control Micro-feed Depth AdjustmentQuill Travel To use the quill feed handle, do these stepsDetermining Needed RPM Cutting Speeds for High Speed Steel HSS Cutting ToolsSetting RPM Unplug the MillSpindle Break-in Procedure To load a tool in the spindle, do these steps Installing ToolsRemoving Cutting Tools To remove cutting tools, do these stepsMaintenance CleaningTable and Base Single Shot Lubrication System Power FeedLubrication Knee Elevating ScrewMaintenance Schedule Maintenance NotesService GibsCrossfeed Adjustment Adjusting BacklashLongitudinal Feed Adjustment To adjust the backlash, do these stepsElectrical Safety Instructions Wiring Diagram Color KEYElectrical Parts Identification StopWiring Diagram VAC 150F CapacitorTroubleshooting Symptom Possible CauseHeadstock Assembly Base Assembly Machine Parts Lists DescriptionCross Lead Screw Machine Labels DescriptionWarranty Warranty Registration CommentsWoodstock international inc. p.o. box Bellingham, wa