Woodstock M1001 manual Assembly, Headstock Adjustment, Handle Installation, Drawbar

Page 18

M1001 6" x 26" Vertical Mill

Assembly

SET UP

The Model M1001 comes fully assembled from the factory with the exception of one of the longitudinal handwheels and the cross handwheel. The head has been rotated to reduce the overall dimension of the shipping crate.

Headstock Adjustment

Loosen the three nuts at the column and rotate the headstock to the "0" position on the column scale (see

Figure 10).

Handle Installation

The longitudinal and cross handwheels shown in Figure 11 need to be installed. The handwheel handles will need to be installed on all the handwheels. Attach the handwheels and handles with the hex wrench, screwdriver, and hardware provided.

Drawbar

Open the top cover and insert the drawbar into the splined spindle located in the center of the front cone pulley (see Figure 12).

Single Shot Lubrication

Unscrew the filler cap and fill the reservoir with non- detergent SAE-20 or similar way oil. Manually pump the lever until resistance from the oil pressure is felt (see

Figure 9).

Nuts 2 & 3

Hidden from

View

Figure 10. Headstock lock nuts.

Longitudinal

HandwheelCross

Handwheel

Knee Feed

Figure 11. Handwheel locations.

Drawbar

Figure 12. Drawbar location.

Figure 9. Single shot lubrication system.

-16-

Image 18
Contents 26 Vertical Mill Page Table of Contents Introduction Woodstock Technical SupportAbout Your New 6 x 26 Vertical Mill Model M1001 Shop FOX Vertical Mill 6 X Lead Screw Info Electrical Controls and Features Safety Standard Machinery Safety InstructionsSafety Additional Safety Instructions for Vertical Mills Full-Load Current Rating ElectricalAvailability Full-Load Current Rating atCircuit Information Nominal Voltage 110V/120V Cycle 60 Hz PhaseNominal Voltage 220V/240V Cycle 60 Hz Phase Circuit Requirements forGrounding & Plug Requirements Extension CordsVoltage Conversion SET UP UnpackingInventory Machine Placement Cleaning Machine M1001 minimum working clearancesUsing Machine Mounts Mounting Mill on Shop FloorBolting to Concrete Floors Handle Installation AssemblyHeadstock Adjustment DrawbarTo begin the test run procedure, do these steps Spindle ControlsTest Run Operations GeneralPositioning Spindle Head Cross Feed Table TravelLongitudinal Feed Control Knee FeedPower Feed Controls Graduated DialsExample Quill Feed Control Micro-feed Depth AdjustmentQuill Travel To use the quill feed handle, do these stepsDetermining Needed RPM Cutting Speeds for High Speed Steel HSS Cutting ToolsSetting RPM Unplug the MillSpindle Break-in Procedure To load a tool in the spindle, do these steps Installing ToolsRemoving Cutting Tools To remove cutting tools, do these stepsMaintenance CleaningTable and Base Single Shot Lubrication System Power FeedLubrication Knee Elevating ScrewMaintenance Schedule Maintenance NotesService GibsCrossfeed Adjustment Adjusting BacklashLongitudinal Feed Adjustment To adjust the backlash, do these stepsElectrical Safety Instructions Wiring Diagram Color KEYElectrical Parts Identification StopWiring Diagram VAC 150F CapacitorTroubleshooting Symptom Possible CauseHeadstock Assembly Base Assembly Machine Parts Lists DescriptionCross Lead Screw Machine Labels DescriptionWarranty Warranty Registration CommentsWoodstock international inc. p.o. box Bellingham, wa