ParaBody GS4 manual X 3-3/4 X 1-3/4

Page 17

 

3/8 X 3-3/4” 6

 

 

 

 

A

 

 

 

26

 

 

X

 

35

 

 

 

 

18

 

19

 

 

 

 

25

 

 

 

 

19

AM

 

 

 

 

35

3/8 X 1-3/4” 11

 

 

 

 

3

3/8 X 8”

AA

35

 

19

 

 

 

FIGURE 16

 

 

STEP 16:

Route the LAT CABLE (AM) through the PRESS ARM SUPPORT FRAME (X) and assemble one 3-1/2” PULLEY (35) to the FRAME PRESS ARM SUPPORT FRAME (X) using one 3/8 X 8” BOLT (3), two 3/8” WASHERS (18), two 3/8 X 1-1/4” SPACERS (25) and one 3/8” LOCK NUT (19). See FIGURE 16.

Route the LAT CABLE (AM) through the FRAME (A) and assemble one 3-1/2” PULLEY (35) to the FRAME (A) using one

3/8 X 3-3/4” BOLT (6), two 3/8 X 1-1/16” FLANGE SPACERS (26) and one 3/8” LOCK NUT (19). See FIGURE 16.

Route the LAT CABLE (AM) around one 3-1/2” PULLEY (35) and assemble the PULLEY to the DOUBLE FLOATING PULLEY BRACKET (AA) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 16. (NOTE: Make sure the cable runs in the grooves of the pulleys.)

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

17

Image 17
Contents GS4 GYM System Important Safety Information Important Notes Components Parts List Hardware Parts List Step Page GS4SHROUD 14 3/8 X 3/4 Slide Collars Donottightenyet PEDESTALto rotate freely Step Screw PRE Lock Washer X 3-3/4 Make sure the cable runs in the grooves of the pulleys X 3-3/4 X 1-3/4 2 Pulley Step 2 Pulley JAM NUT X 3-3/4 8 X 3-3/4 X 1-3/4 8 X 3-3/4 X 2-3/4 X 3 X 3-3/4 Trouble Shooting Maintenance Limited Warranty Life Fitness Consumer Division