ParaBody GS4 manual Pulley Step

Page 18

11 3/8 X 1-3/4”

3/8 X 3-3/4” 6

 

 

 

 

 

D

 

 

 

R

 

 

 

35

 

19

 

24

 

 

E

 

 

 

 

AB

 

 

 

 

S

 

 

 

 

34

 

 

4-1/2” PULLEY 36

19

 

 

 

 

AM

 

 

 

 

 

AM

 

 

 

AF

 

 

 

FIGURE 17

STEP 17:

Route the LAT CABLE (AM) around one 4-1/2” PULLEY (36) and assemble the PULLEY to the LEFT (D) and RIGHT (E) BOOM PLATES using one 3/8 X 3-3/4” BOLT (6), one LONG “L” CABLE BRACE (S), one 1” SPACER (24) and one 3/8” LOCK NUT (19). See FIGURE 17.

SECURELY assemble two PLASTIC SLEEVES (34) to the LEFT (D) and RIGHT (E) BOOM PLATES using two 3/8 X 3-3/4” BOLTS (6) and two 3/8” LOCK NUTS (19) as shown in FIGURE17.

Route the LAT CABLE (AM) around one 3-1/2” PULLEY(35) and assemble two FLOATING PULLEYPLATES (AB) to the 3-1/2” PULLEY (35) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 17. (NOTE: Make sure the cable runs in the grooves of the pulleys.)

Route the LAT CABLE (AM) over two 3-1/2” PULLEYS (35) and assemble the PULLEYS to the LEFT (D) and RIGHT (E) BOOM PLATES using two 3/8 X 3-3/4” BOLTS (6), two SHORT “L” CABLE BRACES (R), two 15/16” SPACERS (24) and two3/8” LOCK NUTS (19). See FIGURE 17.

Screw the threaded end of the LAT CABLE (AM) into the end of the HEAD PLATE ASSEMBLY (AF) .See FIGURE 17.

18

Image 18
Contents GS4 GYM System Important Safety Information Important Notes Components Parts List Hardware Parts List Step Page GS4SHROUD 14 3/8 X 3/4 Slide Collars Donottightenyet PEDESTALto rotate freely Step Screw PRE Lock Washer X 3-3/4 Make sure the cable runs in the grooves of the pulleys X 3-3/4 X 1-3/4 2 Pulley Step 2 Pulley JAM NUT X 3-3/4 8 X 3-3/4 X 1-3/4 8 X 3-3/4 X 2-3/4 X 3 X 3-3/4 Trouble Shooting Maintenance Limited Warranty Life Fitness Consumer Division