ParaBody GS2 manual 33 1/2 X 8-3/4

Page 11

40

1

33 1/2 X 8-3/4”

37

48

SECURELY

TIGHTEN

60

9

FIGURE 9

STEP 9

SECURELY TIGHTEN ALL FRAME CONNECTION BEFORE PROCEEDING TO NEXT STEP

SECURELY TIGHTEN top of both SHAFT COLLARS (48) flush to bottom of both BOOM PLATES (4),(5)

Insert one 3/4 x 4” SHAFT (40) into both 3/4” FLANGE BEARINGS on FRAME (1)

Assemble the PRIMARY PIVOT (9) of the PRESS ARM ASSEMBLY to the top of the FRAME (1) using 1/2 X 8-3/4” BOLT (33), two 1/2” FLAT WASHERS (37) and 1/2” LOCK NUT (60).

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

11

Image 11
Contents GS2 GYM System Important Safety Information Important Notes Page Parts List Step Page Step Handles 7 Must be Placed Towards Inside of Pressarm Tighten 33 1/2 X 8-3/4 Step 32 1/2 X 104mm Illustration a 31 3/8 X 8-3/4 X 3-3/4 31 3/8 X 8-3/4 X 1-3/4 Securely X 3 X 3-3/4 X 1 -3/4 X 3-3/4 Step Pull Maintenance Limited Warranty Life Fitness Consumer Division