ParaBody GS2 manual X 3 X 3-3/4

Page 18

 

11

 

3/8 x 3” 29

 

 

 

 

1

 

 

41

 

 

34

3/8 x 3-3/4” 30

 

 

 

 

42

24

 

 

FIGURE 16

21

34

 

36

STEP 16:

Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

[CABLE MUST BE POSITIONED BETWEEN PULLEY AND LOWER BOLT ASSEMBLY ON LEG PEDESTAL (11) AND FRAME (1)]

Securely assemble the ball end of the LOW CABLE (21) and one 3-1/2” PULLEY (24) to the LEG PEDESTAL (11) using two 3/8 X 3-3/4” BOLTS (30), two 3/8” X 1-1/16” FLANGE SPACERS (42), two 3/8” WASHERS (36), and two 3/8” LOCKNUTS (34).

(NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 16.)

Securely assemble one 3-1/2” PULLEY (24) and two 3/8 X 3/4 FLANGE SPACERS (41) to the FRAME (1) using one 3/8 X 3” BOLTS (29), and one 3/8” LOCKNUT (34). (NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 16.)

18

Image 18
Contents GS2 GYM System Important Safety Information Important Notes Page Parts List Step Page Step Handles 7 Must be Placed Towards Inside of Pressarm Tighten 33 1/2 X 8-3/4 Step 32 1/2 X 104mm Illustration a 31 3/8 X 8-3/4 X 3-3/4 31 3/8 X 8-3/4 X 1-3/4 Securely X 3 X 3-3/4 X 1 -3/4 X 3-3/4 Step Pull Maintenance Limited Warranty Life Fitness Consumer Division