ParaBody GS2 manual X 1 -3/4 X 3-3/4

Page 19

 

12

 

3/8 X 1 -3/4” 27

36

 

 

34

 

 

 

 

43

 

 

24

3/8 X 3-3/4” 30

 

 

3/8 X 3-3/4” 30

3

 

FIGURE 17

 

 

STEP 17:

Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

Assemble one 3-1/2” PULLEY (24) between BASE PLATES (3) using one 3/8 X 3-3/4” BOLT (30), two 3/8 X 1” SPACERS (43), one 3/8” LOCK NUT (34) and tighten securely.

Loosely assemble one 3-1/2” PULLEY (24) between the PULLEY PLATES (12) using one 3/8 X 1-3/4” BOLT (27), and one 3/8” LOCK NUT (34).

Secure end of LOW CABLE (21) using one 3/8 x 3-3/4” BOLT (30), one 3/8” FLAT WASHER (36) and one 3/8” LOCK NUT (34) as shown in FIGURE 17

Tighten both 3-1/2” PULLEYS (24) located on PULLEY PLATES (12)

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

 

0

 

 

1

 

 

2

 

 

3

 

 

4

 

 

5

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19

Image 19
Contents GS2 GYM System Important Safety Information Important Notes Page Parts List Step Page Step Handles 7 Must be Placed Towards Inside of Pressarm Tighten 33 1/2 X 8-3/4 Step 32 1/2 X 104mm Illustration a 31 3/8 X 8-3/4 X 3-3/4 31 3/8 X 8-3/4 X 1-3/4 Securely X 3 X 3-3/4 X 1 -3/4 X 3-3/4 Step Pull Maintenance Limited Warranty Life Fitness Consumer Division