39 | | 14 |
| |
3/8 X 2-3/4” 55 | | 12 |
56 | | |
63 | |
| | 15 |
| | 32 |
| | 63 |
3/8 X 1-3/4” | 53 | 37 |
|
| | 9 |
FIGURE 16 | | |
STEP 16:
•Route the BOOM CABLE (32) over the V-GROOVE PULLEY (39) and the 3-1/2” PULLEY (37) on the LEFT BOOM PLATE (15) and over the 3-1/2” PULLEY (37) on the RIGHT BOOM PLATE (14) and over the V-GROOVE PULLEY (39) as shown in STEP 16.
•SECURELY assemble two 2” NYLON SPACERS (56) to the V-PULLEY PLATES (12) and the BOOM PLATES (14 & 15) using two 3/8 X 2-3/4” BOLTS (55) and two 3/8” LOCK NUTS (63). See FIGURE 15.
•Assemble one 3-1/2” PULLEY (37) to the PULLEY BRACKET (9) using one 3/8 X 1-3/4” BOLT (53) and one 3/8” LOCK NUT (63) (Note: Loop the BOOM CABLE around the PULLEY prior to assembling the PULLEY BRACKET.)
15