ParaBody cm3 manual Cable

Page 20

FIGURE 22

 

 

 

 

LOOP

 

 

CABLE

 

 

37

3/8 X 3-3/4”

57

 

 

51

31

 

 

 

 

11

 

 

63

STEP 22:

Assemble two 3-1/2” PULLEYS (37) to the BASE PLATES (11) using two 3/8 X 3-3/4” BOLTS (57), one 3/8 X 1” SPACER (51) and two 3/8” LOCK NUTS (63). See FIGURE 22.(Note: Loop the ARM CABLE (31) around the PULLEYS prior to assem- bling the PULLEYS. Leave a loop in the ARM CURL as shown!)

FIGURE 23

3/8 X 1-3/4”

53

63

 

9

 

 

 

 

 

 

37

 

 

 

31

STEP 23:

 

 

 

Assemble one 3-1/2” PULLEY (37) to the PULLEY BRACKET (9) using one 3/8 X 1-3/4” BOLT (53) and one 3/8” LOCK NUT (63) (Note: Loop the ARM CABLE (31) around the PULLEY prior to assembling the PULLEY BRACKET.)

20

Image 20
Contents CM3 GYM System Important Safety Information Important Notes ’ 2’ 3’ 4’ 5’ 6’ 7’ 8’ 9’ Parts List KEY Description QTYStep Page CM3 Shroud Option onlyTighten 71 3/8 X 3/4 Loctite Step LOC-TITE Pulley Plates Short Cable X 2-3/4 X 1-3/4 Step X 4-1/4 X 3-3/4 Plates Base PlatesARM Cable Right ARM SupportTighten Step Step Adjustment Maintenance Limited Warranty Life Fitness Consumer Division