ParaBody cm3 manual Arm

Page 19

 

 

 

FIGURE 21

 

 

 

55 3/8 X 2-3/4”

 

63

 

 

 

 

7

5

3/8 X 2-3/4” 55

 

 

56

 

 

 

 

 

39

63

 

 

 

 

38

4-1/2”

 

31

50

 

 

STEP 21:

 

 

 

Route the ARM CABLE (31) through the LEFT ARM (7) as shown in FIGURE 21.

Assemble one V-PULLEY (39) to the LEFT ARM SUPPORT (5) using one 3/8 X 2-3/4” BOLT (55) and one 3/8” LOCK NUT (63). See FIGURE 21. (Note: Loop the ARM CABLE around the PULLEY prior to assembling the LEFT ARM SUPPORT.)

SECURELY assemble one 2” NYLON SPACER (56) to the LEFT ARM SUPPORT (5) using one 3/8 X 2-3/4” BOLT (55) and one 3/8” LOCK NUT (63). See FIGURE 21.

Assemble one 4-1/2” PULLEY (38) to the LEFT ARM (7) using one 3/8 X 2-3/4” BOLT (55), two 3/8 X 1/2” SPACERS (50) and one 3/8” LOCK NUT (63). See FIGURE 21. (Note: Loop the ARM CABLE around the PULLEY prior to assembling the LEFT

ARM.)

19

Image 19
Contents CM3 GYM System Important Safety Information Important Notes ’ 2’ 3’ 4’ 5’ 6’ 7’ 8’ 9’ KEY Description QTY Parts ListStep Page Option only CM3 ShroudTighten 71 3/8 X 3/4 Loctite Step LOC-TITE Pulley Plates Short Cable X 2-3/4 X 1-3/4 Step X 4-1/4 X 3-3/4 Base Plates PlatesARM Cable Support Right ARMTighten Step Step Adjustment Maintenance Limited Warranty Life Fitness Consumer Division