Life Fitness SM62 manual LAT Pulldown Cable Routing, Lat pulldown cable routing

Page 15

SM62 Unpacking & Assembly Instructions

LAT PULLDOWN CABLE ROUTING

Route the lat pulldown cable as shown in Figure 21. Screw the cable into the weight stack as shown previously in Figure 20.

Figure 19. Lat pulldown cable routing.

Bolt the cable to the weight stacks as shown in Figure 20. Thread the 7/8” nut up on the cable bolt as shown at left. Screw the bolt down into the weight stack as shown at right. Tighten the bolt with a 7/8” combination wrench.

Figure 20. Screw the cable into the weight stack.

15

Image 15
Contents M051-K50-B138 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contents box 1 on left, box 2 on rightSM62 main components AssemblySet the weight stack cubes Bolt on the teardrop pulleys Bolt on the connecting beam, lat tops, tricep tops Install the weight stacks. To do this SM62 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the lat benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingCrossover Cable Routing Adjustable crossover cable end detailLat pulldown cable routing LAT Pulldown Cable RoutingTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware