SM62 Unpacking & Assembly Instructions
3/8” x 3” (4) bolt top beams together
U
T
T
7/16” x 6” (8) mount on tops
V
Remove pulleys from housings to give clearance to socket extension
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4.Mount the 56” lat tops (part T) to the cubes using a 5/8” socket and combination wrench by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in Figure 7. Mount the 29” tricep tops (part U) to the cubes using the 7/16” x 6” bolts. Secure to the lat tops using the 3/8” x 3” bolts. Use the hardware configuration shown in Figure 7. You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.
150lb. weight stack
300 lb.
weight stack
150 lb. weight stack
Figure 8. Mount rubber bumpers and the weight stacks.
7