Life Fitness SM62 manual Crossover Cable Routing, Adjustable crossover cable end detail

Page 14

SM62 Unpacking & Assembly Instructions

Figure 17. Adjustable crossover cable end detail.

Using a 7/8” wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure 17. Place a rubber cap on the top of the cable as shown in Figure 17 (right).

CROSSOVER CABLE ROUTING

Once you’ve removed the pulleys as described previously, route the two crossover cables as shown in Figure 18.

Figure 18. Crossover cable routing.

14

Image 14
Contents M051-K50-B138 Materials and Tools Required for Assembly Assembly TimeParts box contents box 1 on left, box 2 on right UnpackingAssembly SM62 main componentsSet the weight stack cubes Bolt on the teardrop pulleys Bolt on the connecting beam, lat tops, tricep tops Install the weight stacks. To do this SM62 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the lat benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail Crossover Cable RoutingLAT Pulldown Cable Routing Lat pulldown cable routingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Pulley hardware InstalledHardware installed Floating pulley