Life Fitness SM62 manual Installing the Cables, Removing the pulley bolts

Page 12

SM62 Unpacking & Assembly Instructions

INSTALLING THE CABLES

The SM62 uses six cables. There are two different types of cable used on the SM62. They are:

1.Crossover cables (ball end cables) (3).

2.Lat pulldown and tricep cables (3).

The lat and tricep cables can be identified by their short length and the adjustable crossover cables can be identified by the ball on the end of the cable. The routings for these cables are shown in the figures below.

NOTE: YOU MUST REMOVE ALL PULLEYS TO ROUTE THE CABLES. USE A 9/16” COMBINATION WRENCH AND SOCKET TO DO THIS (SEE FIGURE 15). YOU MAY WISH TO REMOVE THE SHOULDER BOLTS (FIGURE 15 RIGHT SIDE) BY USING A 3/8” COMBINATION WRENCH AND A 1/8” HEX KEY WRENCH. WHEN YOU HAVE ROUTED THE CABLES, REPLACE ALL PULLEYS AND PLACE END CAPS ON NUT AND BOLT ENDS. YOU MAY NEED TO PRY THE PULLEY HOUSINGS OPEN TO REPLACE THE PULLEYS.

Figure 15. Removing the pulley bolts.

12

Image 12
Contents M051-K50-B138 Materials and Tools Required for Assembly Assembly TimeParts box contents box 1 on left, box 2 on right UnpackingAssembly SM62 main componentsSet the weight stack cubes Bolt on the teardrop pulleys Bolt on the connecting beam, lat tops, tricep tops Install the weight stacks. To do this SM62 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the lat benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail Crossover Cable RoutingLAT Pulldown Cable Routing Lat pulldown cable routingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Installed Hardware installedPulley hardware Floating pulley