Life Fitness manual Assembly, SM62 main components

Page 4

SM62 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM62.

Figure 2. SM62 main components.

1.

Cubes (2)

5.

Tricep top (1)

2.

Lat bench (2)

6.

Adj. X-over top (1)

3.

Connecting beam (1)

7.

300 lb. Weight stacks (2)

4.

Lat tops (2)

8.

190 lb. Weight stacks (4)

1.Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.

4

Image 4
Contents M051-K50-B138 Materials and Tools Required for Assembly Assembly TimeParts box contents box 1 on left, box 2 on right UnpackingAssembly SM62 main componentsSet the weight stack cubes Bolt on the teardrop pulleys Bolt on the connecting beam, lat tops, tricep tops Install the weight stacks. To do this SM62 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the lat benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail Crossover Cable RoutingLAT Pulldown Cable Routing Lat pulldown cable routingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Installed Hardware installedPulley hardware Floating pulley