SM62 Unpacking & Assembly Instructions
Figure 5. Configuration for 6” bolts.
2.Bolt on the teardrop pulleys above the benches (see Figure 6) on both cubes using two 3/8” x 2-3/4” hex head bolts. Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown. You may wish to use a pinch bar to align the bolt holes.
Figure 6. Bolt on the teardrop pulleys.
3.Bolt connecting beam to cubes (part 4 from Figure 2) using a 5/8” socket with extension and combination wrench. Use two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” end cap washers and end caps. Figure 7 shows the connected cubes.
6