Life Fitness SM62 manual Unpacking, Parts box contents box 1 on left, box 2 on right

Page 3

SM62 Unpacking & Assembly Instructions

UNPACKING

Follow the steps below when unpacking the components of the SM62.

1.Cut off the shipping wrapper.

2.Remove the parts boxes and shipping boards.

3.Remove the items in the parts boxes. These items are shown in Figure 1.

A.Remove the bolts bag.

B.Remove the parts shown below. Parts that are used to build the SM62 are described in the section HARDWARE at the end of these instructions.

Figure 1. Parts box contents (box 1 on left, box 2 on right).

3

Image 3
Contents M051-K50-B138 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contents box 1 on left, box 2 on rightSM62 main components AssemblySet the weight stack cubes Bolt on the teardrop pulleys Bolt on the connecting beam, lat tops, tricep tops Install the weight stacks. To do this SM62 Unpacking & Assembly Instructions Mount the benches to the frame Bolt the lat benches to the frame Removing the pulley bolts Installing the CablesAdjustable crossover cable routing Adjustable Crossover Cable RoutingCrossover Cable Routing Adjustable crossover cable end detailLat pulldown cable routing LAT Pulldown Cable RoutingTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware