25
FIGURE 3
78
7675
3
60 3/8 X 1” (25m)
STEP 3:
•SECURELY assemble one STORAGE PEG (25) to the LEFT BOOM SUPPORT (3) using one RH CAPS (78), one 3/8 X 1” BOLT (60), one 3/8” SAE WASHER (75) and one 3/8” RH WASHER (76) as shown in FIGURE 3.
76 | 75 | 63 3/8 X |
|
|
|
| |
73 |
| 78 |
|
|
|
| |
5 |
|
|
|
|
| 6 |
|
3/8 X 4” (97m) | 53 | 1 | |
| |||
FIGURE 4 |
|
|
|
STEP 4:
•LOOSELY assemble the UPRIGHT SUPPORT (6) to the BASE (1) and REAR UPRIGHT (5) using eight RH CAPS (78), two 3/8 X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 | 1/2 |
| 1 | 1/2 | 2 | 1/2 | 3 |
| 1/2 | 4 |
| 1/2 |
| 5 | 1/2 | 6 | |||||||||||||
10 |
| 20 | 30 | 40 | 50 | 60 |
| 70 |
| 80 | 90 | 100 |
| 110 | 120 | 130 | 140 | 150 |
| ||||||||||
|
|
|
|
|
|
7